Mobile County, Alabama · SERC

DC Readiness
67.0
Good / 100

RISER142875 is a substation-adjacent datacenter candidate site in Mobile County, Alabama, interconnecting through SERC. It screens at 67.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationRISER142875
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPBluBroadband Shell Ave
IXP distance89.1 mi
Fiber providers11
Fiber coverage60.4%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance500.8 mi

Site characteristics

Parcel ownerALABAMA POWER CO
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteMOBILE ENERGY LLC HOG BAYOU ENERGY CENTER
Hazard sub-score45/100
Construction cost index88.5 (avg 100)

Location context

Nearest datacenterBluBroadband Shell Ave
DC distance89.1 mi
Nearest rail0.3 mi
Nearest gas pipeline0.2 mi
Nearest fiber route93.5 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.38¢/kWh
Industrial electricity8.18¢/kWh
Cooling degree days2,100
Heating degree days2,800
Land price / acre$4,768

Incentive detail: Sales & use tax abatement on qualifying equipment. $400M+ investment threshold.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
66
Fiber connectivity12%
67
Energy cost10%
85
Water risk8%
92
Natural hazard8%
45
Buildability7%
100
Labor market4%
50
DC cluster4%
20
Land / acreage3%
63
Construction cost3%
76
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
20

Nearby comparable sites

Other scored datacenter candidate sites in Mobile County, ranked by DC Readiness.

Sites near RISER142875
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109076Substation-Adjacent230 kV300 MW1.4 yrs70.5
THEODORESubstation-Adjacent230 kV300 MW1.4 yrs69.3
UNKNOWN109130Substation-Adjacent230 kV300 MW3.7 yrs69.1
UNKNOWN109085Substation-Adjacent230 kV300 MW1.4 yrs68.8
UNKNOWN109059Substation-Adjacent230 kV300 MW3.7 yrs67.1
BIG CREEKSubstation-Adjacent500 kV1,000 MW1.4 yrs67.1
UNKNOWN109077Substation-Adjacent230 kV300 MW1.4 yrs66.6
UNKNOWN109132Substation-Adjacent115 kV100 MW3.7 yrs66.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RISER142875, Mobile County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.