TERROR LAKE MICROGRID

Substation-Adjacent

Kodiak Island County, Alaska

DC Readiness
54.0
Fair / 100

TERROR LAKE MICROGRID is a substation-adjacent datacenter candidate site in Kodiak Island County, Alaska. It screens at 54.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTERROR LAKE MICROGRID
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
Utility commercial rate0.19¢/kWh

Speed to power

Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate18%
Withdrawal rate83%

Connectivity

Fiber providers2
Fiber coverage8.0%
Nearest cloud providerAWS
Nearest cloud regionus-west-2
Cloud region distance1528.8 mi

Site characteristics

Parcel ownerKODIAK ELECTRIC ASSN INC
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteALASKA DOT PF KODIAK M O FAC
Hazard sub-score72/100
Construction cost index112.0 (avg 100)

Location context

Nearest rail2.7 mi
Nearest gas pipeline166.1 mi
Nearest fiber route113.1 mi
County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity18.64¢/kWh
Industrial electricity16.69¢/kWh
Cooling degree days0
Heating degree days10,000
Land price / acre$20,972

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
49
Fiber connectivity12%
43
Energy cost10%
63
Water risk8%
83
Natural hazard8%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
10
Land / acreage3%
30
Construction cost3%
57
Gas pipeline2%
0
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Kodiak Island County, ranked by DC Readiness.

Sites near TERROR LAKE MICROGRID
SiteTypeVoltageCapacityQueue waitScore
SWAMPY ACRESSubstation-Adjacent138 kV100 MW3.5 yrs55.4
UNKNOWN158461Substation-Adjacent138 kV100 MW3.5 yrs55.1
Kodiak MicrogridBrownfield19 MW3.5 yrs47.2
EC FFE Kodiak Island BoroughGreenfield3.5 yrs45.8
WOODY ISLANDFederal Excess45.8
WOODY ISLANDFederal Excess45.5
WOODY ISLANDFederal Excess45.4
WOODY ISLANDFederal Excess44.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TERROR LAKE MICROGRID, Kodiak Island County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.