OZ Wrangell

Greenfield

Wrangell City and Borough, Alaska

DC Readiness
43.7
Fair / 100

OZ Wrangell is a greenfield datacenter candidate site in Wrangell City and Borough, Alaska. It screens at 43.7/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.31¢/kWh

Speed to power

Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate18%
Withdrawal rate83%

Connectivity

Fiber providers1
Fiber coverage38.4%
Nearest cloud providerAzure
Nearest cloud regionwestus2
Cloud region distance814.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerSOUTHEAST ALASKA POWER AGENCY
Land owner typeprivate
Buildability50.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.20
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index122.2 (avg 100)

Location context

Nearest rail2.7 mi
Nearest gas pipeline71.3 mi
Nearest fiber route86.0 mi
County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity31.31¢/kWh
Cooling degree days0
Heating degree days10,000
Land price / acre$20,972

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
49
Fiber connectivity12%
29
Energy cost10%
63
Water risk8%
58
Natural hazard8%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
10
Land / acreage3%
30
Construction cost3%
48
Gas pipeline2%
0
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Wrangell City and Borough, ranked by DC Readiness.

Sites near OZ Wrangell
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN158502Substation-Adjacent115 kV100 MW3.5 yrs55.4
UNKNOWN158501Substation-Adjacent115 kV100 MW3.5 yrs55.4
RISER158504Substation-Adjacent115 kV100 MW3.5 yrs55.1
UNKNOWN158500Substation-Adjacent115 kV100 MW3.5 yrs53.8
RISER158508Substation-Adjacent115 kV100 MW3.5 yrs53.4
RISER158503Substation-Adjacent115 kV100 MW3.5 yrs50.4
RISER158505Substation-Adjacent115 kV100 MW3.5 yrs50.4
TYEESubstation-Adjacent115 kV100 MW3.5 yrs49.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for OZ Wrangell, Wrangell City and Borough. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.