TAP142010
Substation-AdjacentColumbia County, Arkansas · MISO
TAP142010 is a substation-adjacent datacenter candidate site in Columbia County, Arkansas, interconnecting through MISO. It screens at 64.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Columbia County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN107970 | Substation-Adjacent | 500 kV | 1,000 MW | 1.4 yrs | 69.2 |
| Greenfield (UNKNOWN107970 - HOT SPRING GEN) | Greenfield | 500 kV | 1,000 MW | 1.4 yrs | 67.0 |
| UNKNOWN107967 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.7 |
| UNKNOWN116916 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.7 |
| UNKNOWN107975 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.7 |
| HARVEY COUCH | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.4 |
| UNKNOWN107969 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.3 |
| UNKNOWN107971 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP142010, Columbia County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.