Greenfield (UNKNOWN107787 - JONESBORO SPA)

Greenfield

Lawrence County, Arkansas · MISO

DC Readiness
54.8
Fair / 100

Greenfield (UNKNOWN107787 - JONESBORO SPA) is a greenfield datacenter candidate site in Lawrence County, Arkansas, interconnecting through MISO. It screens at 54.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN107787
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_ILLINOIS
Wholesale LMP$33.26/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth34
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance76.4 mi
Fiber providers4
Fiber coverage91.0%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance404.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY ARKANSAS INC
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score47/100
Construction cost index104.6 (avg 100)

Location context

Nearest datacenterSearcy Information Technologies
DC distance74.2 mi
Nearest rail1.2 mi
Nearest gas pipeline0.8 mi
Nearest fiber route231.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity11.70¢/kWh
Industrial electricity9.61¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$4,609

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
48
Fiber connectivity12%
74
Energy cost10%
87
Water risk8%
83
Natural hazard8%
47
Buildability7%
65
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
63
Gas pipeline2%
98
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Lawrence County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN107787 - JONESBORO SPA)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN121109Substation-Adjacent161 kV100 MW1.4 yrs62.5
JONESBORO SPASubstation-Adjacent161 kV100 MW1.4 yrs62.3
UNKNOWN108071Substation-Adjacent161 kV100 MW1.4 yrs61.7
UNKNOWN121108Substation-Adjacent161 kV100 MW1.4 yrs60.9
UNKNOWN108089Substation-Adjacent161 kV100 MW1.4 yrs59.9
Greenfield (JONESBORO SPA - UNKNOWN121232)Greenfield161 kV100 MW1.4 yrs55.9
JONESBORO SPASubstation-Adjacent161 kV100 MW1.4 yrs55.8
Greenfield (UNKNOWN107787 - JONESBORO SPA)Greenfield161 kV100 MW1.4 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN107787 - JONESBORO SPA), Lawrence County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.