Greenfield (UNKNOWN107970 - EL DORADO SUBS)

Greenfield

Union County, Arkansas · MISO

DC Readiness
63.9
Good / 100

Greenfield (UNKNOWN107970 - EL DORADO SUBS) is a greenfield datacenter candidate site in Union County, Arkansas, interconnecting through MISO. It screens at 63.9/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN107970
Substation voltage500 kV
Available capacity1,000 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.11¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPARE-ON Hope
IXP distance47.5 mi
Fiber providers5
Fiber coverage27.0%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance228.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerLacy Family Trust &
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score62/100
Construction cost index87.2 (avg 100)

Location context

Nearest datacenterARE-ON Hope
DC distance47.5 mi
Nearest rail8.7 mi
Nearest gas pipeline3.1 mi
Nearest fiber route130.6 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.74¢/kWh
Industrial electricity7.18¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$2,912

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
48
Fiber connectivity12%
52
Energy cost10%
89
Water risk8%
84
Natural hazard8%
62
Buildability7%
80
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
77
Gas pipeline2%
90
Tax incentive2%
0
Climate / cooling2%
30

Nearby comparable sites

Other scored datacenter candidate sites in Union County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN107970 - EL DORADO SUBS)
SiteTypeVoltageCapacityQueue waitScore
UNION POWER STATIONSubstation-Adjacent500 kV1,000 MW1.4 yrs70.9
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs64.3
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs64.2
Greenfield (UNKNOWN107970 - EL DORADO SUBS)Greenfield500 kV1,000 MW1.4 yrs63.9
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs63.6
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs63.0
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs62.8
UNKNOWN107831Substation-Adjacent115 kV100 MW1.4 yrs62.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN107970 - EL DORADO SUBS), Union County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.