GREEN VALLEY
Substation-AdjacentAdams County, Colorado · WECC
GREEN VALLEY is a substation-adjacent datacenter candidate site in Adams County, Colorado, interconnecting through WECC. It screens at 66.8/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Adams County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| IMBODEN | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 68.8 |
| KEENESBURG | Substation-Adjacent | 230 kV | 300 MW | 1.7 yrs | 66.0 |
| Greenfield (FORT LUPTON - GREEN VALLEY) | Greenfield | 230 kV | 300 MW | 1.7 yrs | 63.4 |
| HUDSON | Substation-Adjacent | 115 kV | 100 MW | 1.7 yrs | 62.2 |
| EC Coal Adams County | Greenfield | — | — | 1.7 yrs | 62.0 |
| EC Coal Adams County | Greenfield | — | — | 1.7 yrs | 61.5 |
| Greenfield (STORY - HENRY LAKE) | Greenfield | 230 kV | 300 MW | 1.7 yrs | 61.5 |
| EC Near Cherokee | Greenfield | — | — | 1.7 yrs | 61.4 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for GREEN VALLEY, Adams County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.