UNKNOWN206914

Substation-Adjacent

Delta County, Colorado · WECC

DC Readiness
58.3
Good / 100

UNKNOWN206914 is a substation-adjacent datacenter candidate site in Delta County, Colorado, interconnecting through WECC. It screens at 58.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN206914
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPColoradoColo - Lakewood (LKWD)
IXP distance145.0 mi
Fiber providers4
Fiber coverage95.1%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance262.5 mi

Site characteristics

Parcel ownerDELTA MONTROSE ELECTRIC ASSN
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyPresent
Superfund siteEPA CLEAN UP MERCURY SPILL
Hazard sub-score45/100
Construction cost index71.1 (avg 100)

Location context

Nearest datacenterColoradoColo - Lakewood (LKWD)
DC distance145.0 mi
Nearest rail0.4 mi
Nearest gas pipeline1.0 mi
Nearest fiber route142.6 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity9.73¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$7,364

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
33
Fiber connectivity12%
44
Energy cost10%
89
Water risk8%
54
Natural hazard8%
45
Buildability7%
100
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
91
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Delta County, ranked by DC Readiness.

Sites near UNKNOWN206914
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN205920Substation-Adjacent115 kV100 MW1.7 yrs62.0
JUANITASubstation-Adjacent115 kV100 MW1.7 yrs61.5
UNKNOWN207591Substation-Adjacent115 kV100 MW1.7 yrs61.4
UNKNOWN203749Substation-Adjacent115 kV100 MW1.7 yrs61.2
TAP205179Substation-Adjacent115 kV100 MW1.7 yrs61.1
TAP203976Substation-Adjacent115 kV100 MW1.7 yrs61.1
UPPER MOLINASubstation-Adjacent115 kV100 MW1.7 yrs60.9
Greenfield (RIFLE PSCO - CURECANTI)Greenfield230 kV300 MW1.7 yrs60.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.