El Paso County, Colorado · WECC

DC Readiness
69.2
Good / 100

MARTIN DRAKE is a substation-adjacent datacenter candidate site in El Paso County, Colorado, interconnecting through WECC. It screens at 69.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMARTIN DRAKE
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPData102 - COS02
IXP distance0.8 mi
Fiber providers16
Fiber coverage57.0%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance397.8 mi

Site characteristics

Parcel ownerColorado Springs City Of
Parcel APN7424101014
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former usegas
Existing capacity257 MW
Retirement date2022-08-01

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSVEDALA INDUSTRIES INC PUMP PROCESS
Hazard sub-score65/100
Construction cost index91.2 (avg 100)

Location context

Nearest datacenterData102 - COS01
DC distance0.8 mi
Nearest rail0.2 mi
Nearest gas pipeline6.9 mi
Nearest fiber route17.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.55¢/kWh
Industrial electricity9.26¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,688

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
50
Fiber connectivity12%
91
Energy cost10%
89
Water risk8%
36
Natural hazard8%
65
Buildability7%
100
Labor market4%
50
DC cluster4%
100
Land / acreage3%
66
Construction cost3%
74
Gas pipeline2%
78
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in El Paso County, ranked by DC Readiness.

Sites near MARTIN DRAKE
SiteTypeVoltageCapacityQueue waitScore
South Plant (CO)Brownfield257 MW74.4
MIDWAYSubstation-Adjacent345 kV600 MW1.7 yrs70.9
UNKNOWN202845Substation-Adjacent230 kV300 MW1.7 yrs70.8
UNKNOWN202239Substation-Adjacent230 kV300 MW1.7 yrs70.8
FRONT RANGE POWER PLANTSubstation-Adjacent230 kV300 MW1.7 yrs69.6
TAP209761Substation-Adjacent230 kV300 MW1.7 yrs69.6
UNKNOWN202739Substation-Adjacent230 kV300 MW1.7 yrs69.4
COTTONWOODSubstation-Adjacent230 kV300 MW1.7 yrs68.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MARTIN DRAKE, El Paso County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.