UNKNOWN203940

Substation-Adjacent

Prowers, Colorado · WECC

DC Readiness
58.4
Good / 100

UNKNOWN203940 is a substation-adjacent datacenter candidate site in Prowers, Colorado, interconnecting through WECC. It screens at 58.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN203940
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPT5@Colorado Springs
IXP distance149.8 mi
Fiber providers3
Fiber coverage14.7%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance400.7 mi

Site characteristics

Parcel ownerSOUTHEAST COLORADO POWER ASSN
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index48.1 (avg 100)

Location context

Nearest datacenterDatacenter 00476609221
DC distance136.6 mi
Nearest rail2.3 mi
Nearest gas pipeline16.2 mi
Nearest fiber route71.7 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.53¢/kWh
Industrial electricity12.84¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$1,393

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
33
Fiber connectivity12%
52
Energy cost10%
89
Water risk8%
55
Natural hazard8%
75
Buildability7%
65
Labor market4%
50
DC cluster4%
20
Land / acreage3%
54
Construction cost3%
100
Gas pipeline2%
48
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in Prowers, ranked by DC Readiness.

Sites near UNKNOWN203940
SiteTypeVoltageCapacityQueue waitScore
COLORADO GREENSubstation-Adjacent230 kV300 MW1.7 yrs62.6
COLORADO GREEN HOLDINGS LLCSubstation-Adjacent230 kV300 MW1.7 yrs62.5
UNKNOWN208110Substation-Adjacent115 kV100 MW1.7 yrs58.8
TAP208106Substation-Adjacent115 kV100 MW1.7 yrs58.2
TAP208107Substation-Adjacent115 kV100 MW1.7 yrs58.1
TAP206905Substation-Adjacent115 kV100 MW1.7 yrs58.1
UNKNOWN201313Substation-Adjacent115 kV100 MW1.7 yrs57.9
UNKNOWN203943Substation-Adjacent115 kV100 MW1.7 yrs57.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN203940, Prowers. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.