OZ San Miguel

Greenfield

San Miguel County, Colorado · WECC

DC Readiness
47.6
Fair / 100

OZ San Miguel is a greenfield datacenter candidate site in San Miguel County, Colorado, interconnecting through WECC. It screens at 47.6/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Fiber providers4
Fiber coverage39.9%
Nearest cloud providerGCP
Nearest cloud regionus-west3
Cloud region distance259.1 mi

Site characteristics

Site typeGreenfield
Parcel ownerBLM
Parcel APNBLM
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)3.20
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index92.8 (avg 100)

Location context

Nearest rail4.1 mi
Nearest gas pipeline7.3 mi
Nearest fiber route64.8 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.68¢/kWh
Industrial electricity13.77¢/kWh
Cooling degree days700
Heating degree days6,200
Land price / acre$2,179

Incentive detail: Enterprise Zone sales tax exemptions; broadband equipment tax credit.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
33
Fiber connectivity12%
41
Energy cost10%
89
Water risk8%
51
Natural hazard8%
55
Buildability7%
40
Labor market4%
50
DC cluster4%
10
Land / acreage3%
52
Construction cost3%
73
Gas pipeline2%
77
Tax incentive2%
100
Climate / cooling2%
90

Nearby comparable sites

Other scored datacenter candidate sites in San Miguel County, ranked by DC Readiness.

Sites near OZ San Miguel
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN205449Substation-Adjacent138 kV100 MW1.7 yrs58.9
Greenfield (HUNTINGTON - PINTO)Greenfield345 kV600 MW1.7 yrs58.5
UNKNOWN203905Substation-Adjacent115 kV100 MW1.7 yrs58.1
UNKNOWN201518Substation-Adjacent115 kV100 MW1.7 yrs56.5
Greenfield (MONTROSE - HESPERUS)Greenfield345 kV600 MW1.7 yrs55.4
Greenfield (CURECANTI - LOST CANYON)Greenfield230 kV300 MW1.7 yrs55.4
Greenfield (MONTROSE - HESPERUS)Greenfield345 kV600 MW1.7 yrs55.2
Greenfield (MONTROSE - HESPERUS)Greenfield345 kV600 MW1.7 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.