New Castle County, Delaware · PJM

DC Readiness
71.6
Excellent / 100

RED LION is a substation-adjacent datacenter candidate site in New Castle County, Delaware, interconnecting through PJM. It screens at 71.6/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.1 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationRED LION
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
LMP zonePJM_DOM
Wholesale LMP$43.92/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth864
Avg queue wait3.1 yrs
Recent queue wait3.6 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPUSNAMES-NET
IXP distance16.7 mi
Fiber providers7
Fiber coverage95.0%
Nearest cloud providerAWS
Nearest cloud regionus-east-1
Cloud region distance105.9 mi

Site characteristics

Parcel ownerDELMARVA POWER
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score67/100
Construction cost index101.2 (avg 100)

Location context

Nearest datacenterUSNAMES-NET
DC distance16.7 mi
Nearest rail6.7 mi
Nearest gas pipeline2.2 mi
Nearest fiber route8.5 mi
County hazard (FEMA NRI)Relatively Low (18)
DC tax incentiveNo
Commercial electricity10.48¢/kWh
Industrial electricity5.76¢/kWh
Cooling degree days1,100
Heating degree days4,500
Land price / acre$11,212

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power15%
39
Fiber connectivity12%
81
Energy cost10%
84
Water risk8%
85
Natural hazard8%
67
Buildability7%
65
Labor market4%
50
DC cluster4%
65
Land / acreage3%
37
Construction cost3%
66
Gas pipeline2%
93
Tax incentive2%
0
Climate / cooling2%
70

Nearby comparable sites

Other scored datacenter candidate sites in New Castle County, ranked by DC Readiness.

Sites near RED LION
SiteTypeVoltageCapacityQueue waitScore
ROCK SPRINGSSubstation-Adjacent500 kV1,000 MW1.5 yrs80.4
RED LIONSubstation-Adjacent500 kV1,000 MW1.5 yrs77.9
KEENEYSubstation-Adjacent500 kV1,000 MW1.5 yrs76.8
HARMONYSubstation-Adjacent230 kV300 MW1.5 yrs75.4
UNKNOWN128201Substation-Adjacent230 kV300 MW1.5 yrs74.6
HARMONYSubstation-Adjacent230 kV300 MW3.0 yrs74.1
UNKNOWN129069Substation-Adjacent230 kV300 MW1.5 yrs74.1
HOPE CREEKSubstation-Adjacent500 kV1,000 MW3.1 yrs73.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RED LION, New Castle County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.