CRYSTAL RIVER

Substation-Adjacent

Citrus, Florida · SERC

DC Readiness
68.3
Good / 100

CRYSTAL RIVER is a substation-adjacent datacenter candidate site in Citrus, Florida, interconnecting through SERC. It screens at 68.3/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCRYSTAL RIVER
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPFlexential - Tampa/North (TPA03)
IXP distance58.7 mi
Fiber providers9
Fiber coverage8.9%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance332.1 mi

Site characteristics

Parcel ownerDUKE ENERGY FLORIDA, INC
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone AE (SFHA)
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score30/100
Construction cost index67.0 (avg 100)

Location context

Nearest datacenterUF Research Computing Center
DC distance54.9 mi
Nearest rail4.1 mi
Nearest gas pipeline2.5 mi
Nearest fiber route55.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.18¢/kWh
Industrial electricity8.09¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$13,801

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power15%
75
Fiber connectivity12%
13
Energy cost10%
89
Water risk8%
81
Natural hazard8%
30
Buildability7%
90
Labor market4%
50
DC cluster4%
40
Land / acreage3%
40
Construction cost3%
94
Gas pipeline2%
92
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Citrus, ranked by DC Readiness.

Sites near CRYSTAL RIVER
SiteTypeVoltageCapacityQueue waitScore
Greenfield (CRYSTAL RIVER - CENTRAL FLORID)Greenfield500 kV1,000 MW3.6 yrs67.6
TAP155704Substation-Adjacent230 kV300 MW3.6 yrs67.2
CRYSTAL RIVER EASTSubstation-Adjacent230 kV300 MW3.6 yrs66.9
BEVERLY HILLSSubstation-Adjacent115 kV100 MW3.6 yrs64.6
UNKNOWN108227Substation-Adjacent115 kV100 MW3.6 yrs64.5
HOMOSASSASubstation-Adjacent115 kV100 MW3.6 yrs64.3
TAP151112Substation-Adjacent115 kV100 MW3.6 yrs64.2
CRYSTAL RIVER WRECSubstation-Adjacent115 kV100 MW3.6 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.