Datacenter Sites in Duval, Florida

Duval has 266 scored datacenter candidate sites averaging 57.2/100 DC Readiness, with a catalogued aggregate of 16,137 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

266
Candidate sites
57.2/100
Avg DC Readiness
16,137 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating

Site-selection context for Duval

Yessales_tax_exemption
Datacenter tax incentive
10.97¢/kWh
Commercial electricity
7.84¢/kWh
Industrial electricity
18
Fiber providers
Low-Medium
Water stress
$13,486
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

By site type

Top datacenter sites in Duval

Top datacenter sites in Duval
SiteTypeVoltageCapacityQueue waitScore
BARTRAMSubstation-Adjacent230 kV300 MW3.6 yrs75.6
UNKNOWN120521Substation-Adjacent230 kV300 MW3.6 yrs75.0
UNKNOWN120519Substation-Adjacent230 kV300 MW3.6 yrs74.1
UNKNOWN120554Substation-Adjacent230 kV300 MW5.8 yrs74.1
FORT CAROLINESubstation-Adjacent230 kV300 MW5.8 yrs73.5
BLOUNT ISLANDSubstation-Adjacent230 kV300 MW5.8 yrs73.2
TAP161532Substation-Adjacent230 kV300 MW3.6 yrs73.2
TAP151528Substation-Adjacent230 kV300 MW3.6 yrs72.7
UNKNOWN120554Substation-Adjacent230 kV300 MW3.6 yrs72.2
NORMANDYSubstation-Adjacent230 kV300 MW5.8 yrs71.9
POWERSSubstation-Adjacent138 kV100 MW3.6 yrs71.9
JAX HEIGHTSSubstation-Adjacent230 kV300 MW3.6 yrs71.8
ROBINWOODSubstation-Adjacent230 kV300 MW3.6 yrs71.7
SOUTHPOINTSubstation-Adjacent138 kV100 MW3.6 yrs71.7
UNKNOWN121605Substation-Adjacent138 kV100 MW3.6 yrs71.3
ANHEUSER-BUSCHSubstation-Adjacent138 kV100 MW5.8 yrs70.3
LANESubstation-Adjacent138 kV100 MW3.6 yrs70.2
HARTLEYSubstation-Adjacent230 kV300 MW3.6 yrs70.0
UNKNOWN150868Substation-Adjacent138 kV100 MW5.8 yrs69.6
Greenfield (DUVAL - THALMANN)Greenfield500 kV1,000 MW5.8 yrs69.5
NORMANDYSubstation-Adjacent230 kV300 MW3.6 yrs69.4
GARDEN CITYSubstation-Adjacent138 kV100 MW5.8 yrs69.2
GREENLANDSubstation-Adjacent230 kV300 MW3.6 yrs68.5
FORESTSubstation-Adjacent230 kV300 MW3.6 yrs68.5
PHILIPSSubstation-Adjacent138 kV100 MW3.6 yrs68.3

Duval datacenter FAQ

How many datacenter sites are in Duval?
266 scored datacenter candidate sites, averaging 57.2/100 DC Readiness.
Does Duval offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Duval?
FEMA's National Risk Index rates Duval as "Very High" (score 55).
What are industrial electricity rates in Duval?
Average industrial electricity is 7.84¢/kWh and commercial is 10.97¢/kWh in Duval.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Duval, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.