Greenfield (UNKNOWN120728 - HOLMES CREEK)

Greenfield

Holmes County, Florida · SERC

DC Readiness
55.8
Good / 100

Greenfield (UNKNOWN120728 - HOLMES CREEK) is a greenfield datacenter candidate site in Holmes County, Florida, interconnecting through SERC. It screens at 55.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN120728
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPBluBroadband Shell Ave
IXP distance69.3 mi
Fiber providers4
Fiber coverage2.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance363.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerGULF POWER CO
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index51.6 (avg 100)

Location context

Nearest datacenterAngelTrax Data Center
DC distance21.7 mi
Nearest rail11.7 mi
Nearest gas pipeline15.0 mi
Nearest fiber route15.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.66¢/kWh
Industrial electricity7.73¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$4,558

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
68
Fiber connectivity12%
43
Energy cost10%
85
Water risk8%
77
Natural hazard8%
45
Buildability7%
65
Labor market4%
50
DC cluster4%
60
Land / acreage3%
56
Construction cost3%
100
Gas pipeline2%
52
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Holmes County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN120728 - HOLMES CREEK)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN108191Substation-Adjacent115 kV100 MW3.7 yrs63.6
UNKNOWN108199Substation-Adjacent115 kV100 MW3.7 yrs61.6
UNKNOWN120728Substation-Adjacent115 kV100 MW3.7 yrs61.6
UNKNOWN109736Substation-Adjacent115 kV100 MW3.7 yrs59.3
BONIFAYSubstation-Adjacent115 kV100 MW3.7 yrs59.0
UNKNOWN120723Substation-Adjacent115 kV100 MW3.7 yrs58.8
UNKNOWN108189Substation-Adjacent115 kV100 MW3.7 yrs57.1
TAP153043Substation-Adjacent115 kV100 MW3.7 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN120728 - HOLMES CREEK), Holmes County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.