Indian River County has 35 scored datacenter candidate sites averaging 61.4/100 DC Readiness, with a catalogued aggregate of 12,900 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.

35
Candidate sites
61.4/100
Avg DC Readiness
12,900 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating

Site-selection context for Indian River County

Yessales_tax_exemption
Datacenter tax incentive
10.74¢/kWh
Commercial electricity
10.74¢/kWh
Industrial electricity
6
Fiber providers
Low-Medium
Water stress
$6,645
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

By site type

Top datacenter sites in Indian River County

Top datacenter sites in Indian River County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN120592Substation-Adjacent230 kV300 MW3.6 yrs70.5
UNKNOWN108560Substation-Adjacent138 kV100 MW3.6 yrs68.9
UNKNOWN124069Substation-Adjacent138 kV100 MW3.6 yrs68.5
UNKNOWN108524Substation-Adjacent230 kV300 MW3.6 yrs68.1
BABCOCKSubstation-Adjacent138 kV100 MW3.6 yrs67.6
Greenfield (POINSETT - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs66.8
UNKNOWN167568Substation-Adjacent500 kV1,000 MW3.6 yrs66.8
Greenfield (POINSETT - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs66.5
UNKNOWN108585Substation-Adjacent138 kV100 MW3.6 yrs66.4
MICCOSubstation-Adjacent138 kV100 MW3.6 yrs66.3
SOUTHSubstation-Adjacent138 kV100 MW3.6 yrs66.1
Greenfield (MARTIN - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs65.1
Greenfield (MIDWAY - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs65.1
VERO BEACHSubstation-Adjacent138 kV100 MW3.6 yrs65.1
Greenfield (POINSETT - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs64.9
UNKNOWN151378Substation-Adjacent230 kV300 MW3.6 yrs64.9
Greenfield (UNKNOWN120592 - UNKNOWN124319)Greenfield230 kV300 MW3.6 yrs64.6
Greenfield (MIDWAY - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs64.4
Greenfield (UNKNOWN120592 - EMERSON)Greenfield230 kV300 MW3.6 yrs64.3
UNKNOWN120324Substation-Adjacent230 kV300 MW3.6 yrs64.1
UNKNOWN108586Substation-Adjacent138 kV100 MW3.6 yrs64.0
SEBASTIANSubstation-Adjacent138 kV100 MW3.6 yrs64.0
Greenfield (MARTIN - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs63.1
Greenfield (POINSETT - UNKNOWN167568)Greenfield500 kV1,000 MW3.6 yrs62.6
Greenfield (UNKNOWN108524 - UNKNOWN151378)Greenfield230 kV300 MW3.6 yrs61.0

Indian River County datacenter FAQ

How many datacenter sites are in Indian River County?
35 scored datacenter candidate sites, averaging 61.4/100 DC Readiness.
Does Indian River County offer datacenter tax incentives?
Sales tax exemption on manufacturing machinery including servers; no state income tax.
What is the natural-hazard risk in Indian River County?
FEMA's National Risk Index rates Indian River County as "Very High" (score 55).
What are industrial electricity rates in Indian River County?
Average industrial electricity is 10.74¢/kWh and commercial is 10.74¢/kWh in Indian River County.