Leon County, Florida · SERC

DC Readiness
69.1
Good / 100

TAP142864 is a substation-adjacent datacenter candidate site in Leon County, Florida, interconnecting through SERC. It screens at 69.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP142864
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance10.6 mi
Fiber providers10
Fiber coverage64.4%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance306.3 mi

Site characteristics

Parcel ownerDUKE ENERGY FLORIDA, LLC
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index77.4 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance10.6 mi
Nearest rail9.3 mi
Nearest gas pipeline0.7 mi
Nearest fiber route179.8 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.20¢/kWh
Industrial electricity8.43¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$7,248

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
70
Fiber connectivity12%
73
Energy cost10%
89
Water risk8%
84
Natural hazard8%
45
Buildability7%
92
Labor market4%
50
DC cluster4%
80
Land / acreage3%
43
Construction cost3%
86
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Leon County, ranked by DC Readiness.

Sites near TAP142864
SiteTypeVoltageCapacityQueue waitScore
ARVAH B HOPKINSSubstation-Adjacent230 kV300 MW5.8 yrs75.9
LINE 17Substation-Adjacent230 kV300 MW5.8 yrs73.9
Arvah B HopkinsBrownfield441 MW3.6 yrs70.7
UNKNOWN162146Substation-Adjacent230 kV300 MW5.8 yrs70.6
UNKNOWN120743Substation-Adjacent230 kV300 MW5.8 yrs70.5
UNKNOWN121037Substation-Adjacent115 kV100 MW5.8 yrs70.2
UNKNOWN121015Substation-Adjacent115 kV100 MW5.8 yrs70.1
SUBSTATION 14Substation-Adjacent115 kV100 MW5.8 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP142864, Leon County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.