SEMINOLE ELECTRIC COOPERATIVE

Substation-Adjacent

Marion County, Florida · SERC

DC Readiness
64.8
Good / 100

SEMINOLE ELECTRIC COOPERATIVE is a substation-adjacent datacenter candidate site in Marion County, Florida, interconnecting through SERC. It screens at 64.8/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 3.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSEMINOLE ELECTRIC COOPERATIVE
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.6 yrs
Recent queue wait3.3 yrs
Completion rate26%
Withdrawal rate74%

Connectivity

Nearest IXPSmart City Telecom Maitland Colo
IXP distance59.4 mi
Fiber providers18
Fiber coverage38.4%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance294.2 mi

Site characteristics

Parcel ownerDUKE ENERGY FLORIDA, LLC
Land owner typeprivate
Buildability40.0/100
Land cover (NLCD)Evergreen Forest

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index72.9 (avg 100)

Location context

Nearest datacenterUF Research Computing Center
DC distance30.5 mi
Nearest rail4.9 mi
Nearest gas pipeline5.6 mi
Nearest fiber route41.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.21¢/kWh
Industrial electricity9.23¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$12,964

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
75
Fiber connectivity12%
40
Energy cost10%
89
Water risk8%
76
Natural hazard8%
45
Buildability7%
40
Labor market4%
50
DC cluster4%
60
Land / acreage3%
34
Construction cost3%
89
Gas pipeline2%
82
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Marion County, ranked by DC Readiness.

Sites near SEMINOLE ELECTRIC COOPERATIVE
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN108236Substation-Adjacent230 kV300 MW3.6 yrs70.5
DEADEND167092Substation-Adjacent230 kV300 MW3.6 yrs70.0
UNKNOWN120464Substation-Adjacent230 kV300 MW3.6 yrs69.5
UNKNOWN120466Substation-Adjacent230 kV300 MW3.6 yrs67.5
TAP151445Substation-Adjacent230 kV300 MW3.6 yrs64.2
Greenfield (UNKNOWN121765 - SEMINOLE ELECT)Greenfield230 kV300 MW3.6 yrs64.0
Greenfield (DELAND WEST - TAP151445)Greenfield230 kV300 MW3.6 yrs63.3
Greenfield (UNKNOWN108236 - UNKNOWN120464)Greenfield230 kV300 MW3.6 yrs61.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SEMINOLE ELECTRIC COOPERATIVE, Marion County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.