Greenfield (UNKNOWN120702 - UNKNOWN120703) is a greenfield datacenter candidate site in Santa Rosa County, Florida, interconnecting through SERC. It screens at 61.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN120702
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPBluBroadband Shell Ave
IXP distance21.0 mi
Fiber providers8
Fiber coverage63.1%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance444.2 mi

Site characteristics

Site typeGreenfield
Parcel ownerGULF POWER CO
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)1.20
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index80.3 (avg 100)

Location context

Nearest datacenterBluBroadband Shell Ave
DC distance21.0 mi
Nearest rail6.3 mi
Nearest gas pipeline6.6 mi
Nearest fiber route31.8 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.06¢/kWh
Industrial electricity8.61¢/kWh
Cooling degree days3,500
Heating degree days700
Land price / acre$6,486

Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
68
Fiber connectivity12%
71
Energy cost10%
85
Water risk8%
80
Natural hazard8%
45
Buildability7%
92
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
83
Gas pipeline2%
79
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Santa Rosa County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN120702 - UNKNOWN120703)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN175929Substation-Adjacent115 kV100 MW3.7 yrs67.8
UNKNOWN120703Substation-Adjacent230 kV300 MW3.7 yrs67.4
UNKNOWN120702Substation-Adjacent115 kV100 MW3.7 yrs66.6
UNKNOWN120652Substation-Adjacent115 kV100 MW3.7 yrs65.8
AIR PRODUCTSSubstation-Adjacent115 kV100 MW3.7 yrs65.2
Greenfield (UNKNOWN120692 - UNKNOWN120703)Greenfield230 kV300 MW3.7 yrs65.1
SANTA ROSA ENERGY CENTERSubstation-Adjacent230 kV300 MW3.7 yrs64.5
Greenfield (UNKNOWN120692 - UNKNOWN120703)Greenfield230 kV300 MW3.7 yrs63.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.