Datacenter Sites in Walton County, Florida
Walton County has 55 scored datacenter candidate sites averaging 56.4/100 DC Readiness, with a catalogued aggregate of 4,811 MW. FEMA rates local natural-hazard risk as "Very High". The county has a datacenter tax incentive on record.
55
Candidate sites
56.4/100
Avg DC Readiness
4,811 MW
Catalogued capacity
theoretical aggregate
Very High
Hazard rating
Site-selection context for Walton County
Yessales_tax_exemption
Datacenter tax incentive
12.66¢/kWh
Commercial electricity
8.17¢/kWh
Industrial electricity
13
Fiber providers
Low-Medium
Water stress
$5,504
Land price / acre
3,500
Cooling degree days
700
Heating degree days
72°F
Mean annual temp
Incentive detail: Sales tax exemption on manufacturing machinery including servers; no state income tax.
By site type
Top datacenter sites in Walton County
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| SHAKY JOE SWAMP TAP | Substation-Adjacent | 230 kV | 300 MW | 3.7 yrs | 66.6 |
| UNKNOWN120717 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 65.5 |
| UNKNOWN120725 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 65.2 |
| DEADEND167081 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 64.4 |
| SANDESTIN | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 62.9 |
| UNKNOWN120668 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 62.9 |
| Greenfield (SHAKY JOE SWAMP TAP - SHOAL RI) | Greenfield | 230 kV | 300 MW | 3.7 yrs | 62.4 |
| TAP143158 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 62.2 |
| FREEPORT | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 61.9 |
| PORTLAND (FL) | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 61.9 |
| TAP143036 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 61.9 |
| MIRAMAR | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 61.9 |
| Greenfield (TAP143238 - SHOAL RIVER) | Greenfield | 230 kV | 300 MW | 3.7 yrs | 60.8 |
| EC Near Portland (FL) | Greenfield | — | — | 3.6 yrs | 60.4 |
| TAP142788 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 59.3 |
| TAP142885 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 59.2 |
| UNKNOWN120722 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 59.1 |
| Greenfield (SHAKY JOE SWAMP TAP - SHOAL RI) | Greenfield | 230 kV | 300 MW | 3.7 yrs | 59.0 |
| Greenfield (SHAKY JOE SWAMP TAP - SHOAL RI) | Greenfield | 230 kV | 300 MW | 3.7 yrs | 58.8 |
| TAP174784 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 58.7 |
| Greenfield (TAP143036 - TAP156275) | Greenfield | 115 kV | 100 MW | 3.7 yrs | 58.3 |
| UNKNOWN120667 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 58.0 |
| EC Near Portland (FL) | Greenfield | — | — | 3.6 yrs | 57.9 |
| SANTA ROSA BEACH | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 57.9 |
| Portland (FL) | Brownfield | — | 11 MW | 3.6 yrs | 57.6 |
Walton County datacenter FAQ
- How many datacenter sites are in Walton County?
- 55 scored datacenter candidate sites, averaging 56.4/100 DC Readiness.
- Does Walton County offer datacenter tax incentives?
- Sales tax exemption on manufacturing machinery including servers; no state income tax.
- What is the natural-hazard risk in Walton County?
- FEMA's National Risk Index rates Walton County as "Very High" (score 55).
- What are industrial electricity rates in Walton County?
- Average industrial electricity is 8.17¢/kWh and commercial is 12.66¢/kWh in Walton County.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Walton County, Florida. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.