UNKNOWN107666

Substation-Adjacent

Grady County, Georgia · SERC

DC Readiness
72.0
Excellent / 100

UNKNOWN107666 is a substation-adjacent datacenter candidate site in Grady County, Georgia, interconnecting through SERC. It screens at 72.0/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 5.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN107666
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait5.8 yrs
Recent queue wait5.2 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPEdgeConneX Tallahassee (EDCTAL01)
IXP distance26.7 mi
Fiber providers6
Fiber coverage93.2%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance303.0 mi

Site characteristics

Parcel ownerGEORGIA POWER CO
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)1.00
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSODREL TRANSPORT LLC
Hazard sub-score50/100
Construction cost index66.9 (avg 100)

Location context

Nearest datacenterEdgeConneX Tallahassee (EDCTAL01)
DC distance26.7 mi
Nearest rail1.6 mi
Nearest gas pipeline7.7 mi
Nearest fiber route138.8 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.18¢/kWh
Industrial electricity14.07¢/kWh
Cooling degree days2,200
Heating degree days2,400
Land price / acre$3,955

Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
70
Fiber connectivity12%
77
Energy cost10%
89
Water risk8%
83
Natural hazard8%
50
Buildability7%
65
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
94
Gas pipeline2%
75
Tax incentive2%
100
Climate / cooling2%
15

Nearby comparable sites

Other scored datacenter candidate sites in Grady County, ranked by DC Readiness.

Sites near UNKNOWN107666
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111595Substation-Adjacent230 kV300 MW5.8 yrs71.6
UNKNOWN111598Substation-Adjacent115 kV100 MW5.8 yrs70.5
UNKNOWN111599Substation-Adjacent115 kV100 MW5.8 yrs69.0
TAP161824Substation-Adjacent115 kV100 MW5.8 yrs68.6
Greenfield (UNKNOWN107666 - UNKNOWN120743)Greenfield230 kV300 MW5.8 yrs68.1
UNKNOWN111600Substation-Adjacent115 kV100 MW5.8 yrs67.6
TAP143251Substation-Adjacent115 kV100 MW5.8 yrs66.9
Greenfield (UNKNOWN107666 - UNKNOWN111595)Greenfield230 kV300 MW5.8 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN107666, Grady County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.