Greenfield (WEST MCINTOSH - UNKNOWN155812)
GreenfieldScreven County, Georgia · SERC
Greenfield (WEST MCINTOSH - UNKNOWN155812) is a greenfield datacenter candidate site in Screven County, Georgia, interconnecting through SERC. It screens at 68.8/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on data processing equipment; investment tax credits for $150M+ projects.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Screven County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| Greenfield (WEST MCINTOSH - UNKNOWN155812) | Greenfield | 500 kV | 1,000 MW | 3.7 yrs | 72.5 |
| UNKNOWN112376 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 71.2 |
| Greenfield (WEST MCINTOSH - UNKNOWN155812) | Greenfield | 500 kV | 1,000 MW | 3.7 yrs | 69.0 |
| TAP155700 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 67.7 |
| Greenfield (WEST MCINTOSH - UNKNOWN155812) | Greenfield | 500 kV | 1,000 MW | 3.7 yrs | 66.8 |
| Greenfield (WEST MCINTOSH - UNKNOWN155812) | Greenfield | 500 kV | 1,000 MW | 3.7 yrs | 66.6 |
| UNKNOWN155699 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 65.8 |
| UNKNOWN116831 | Substation-Adjacent | 115 kV | 100 MW | 3.7 yrs | 65.0 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Greenfield (WEST MCINTOSH - UNKNOWN155812), Screven County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.