Fair Station

Brownfield

Rock Island County, Illinois · MISO

DC Readiness
69.0
Good / 100

Fair Station is a brownfield datacenter candidate site in Rock Island County, Illinois, interconnecting through MISO. It screens at 69.0/100 DC Readiness with a catalogued 63 MW of candidate capacity.

Power & interconnection

Substation distance0.0 mi
Available capacity63 MW
Utility commercial rate0.06¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth21

Connectivity

Nearest IXPSFN IA-Davenport
IXP distance12.2 mi
Fiber providers11
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance145.2 mi

Site characteristics

Site typeBrownfield
Land owner typeprivate
Buildability75.0/100
Former usecoal
Existing capacity63 MW
Retirement date2013-11-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatPresent
Superfund nearbyPresent
Superfund siteCENTRAL IOWA POWER COOPERATIVE FAIR STATION FORMER SITE OF
Hazard sub-score35/100
Construction cost index95.7 (avg 100)

Location context

Nearest datacenterSFN IA-Davenport
DC distance12.2 mi
Nearest rail0.5 mi
Nearest gas pipeline3.9 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity5.51¢/kWh
Industrial electricity3.55¢/kWh
Cooling degree days1,100
Heating degree days5,600
Land price / acre$9,125

Incentive detail: Enterprise Zone sales tax exemption; High Impact Business designation for $12M+ DC investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
49
Fiber connectivity12%
89
Energy cost10%
100
Water risk8%
88
Natural hazard8%
35
Buildability7%
75
Labor market4%
50
DC cluster4%
85
Land / acreage3%
49
Construction cost3%
70
Gas pipeline2%
87
Tax incentive2%
100
Climate / cooling2%
70

Nearby comparable sites

Other scored datacenter candidate sites in Rock Island County, ranked by DC Readiness.

Sites near Fair Station
SiteTypeVoltageCapacityQueue waitScore
SUB 39Substation-Adjacent345 kV600 MW1.4 yrs76.5
OAK GROVESubstation-Adjacent345 kV600 MW1.4 yrs75.3
RiversideBrownfield141 MW74.5
UNKNOWN132671Substation-Adjacent161 kV100 MW1.4 yrs73.7
UNKNOWN132672Substation-Adjacent161 kV100 MW1.4 yrs73.7
RIVERSIDESubstation-Adjacent161 kV100 MW1.4 yrs73.1
UNKNOWN121970Substation-Adjacent161 kV100 MW1.4 yrs73.0
FAIR STATIONSubstation-Adjacent161 kV100 MW1.4 yrs71.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Fair Station, Rock Island County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.