ALLEN, Indiana · PJM

DC Readiness
65.9
Good / 100

TAP160648 is a substation-adjacent datacenter candidate site in ALLEN, Indiana, interconnecting through PJM. It screens at 65.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP160648
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPINdigital
IXP distance8.5 mi
Fiber providers15
Fiber coverage72.4%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance132.0 mi

Site characteristics

Parcel ownerINDIANA MICHIGAN POWER CO
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteSCHENK GERALD
Hazard sub-score58/100
Construction cost index95.1 (avg 100)

Location context

Nearest datacenterINdigital
DC distance8.5 mi
Nearest rail7.0 mi
Nearest gas pipeline9.9 mi
Nearest fiber route101.6 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.79¢/kWh
Industrial electricity8.51¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,803

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
35
Fiber connectivity12%
84
Energy cost10%
83
Water risk8%
90
Natural hazard8%
58
Buildability7%
75
Labor market4%
50
DC cluster4%
85
Land / acreage3%
42
Construction cost3%
71
Gas pipeline2%
68
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in ALLEN, ranked by DC Readiness.

Sites near TAP160648
SiteTypeVoltageCapacityQueue waitScore
R.P.MONESubstation-Adjacent345 kV600 MW3.0 yrs73.8
ILLINOIS ROADSubstation-Adjacent345 kV600 MW3.0 yrs72.1
UNKNOWN123161Substation-Adjacent138 kV100 MW3.0 yrs69.1
UNKNOWN122670Substation-Adjacent138 kV100 MW3.0 yrs69.0
ROBISON PARK (345 KV)Substation-Adjacent345 kV600 MW3.0 yrs68.8
UNKNOWN122665Substation-Adjacent138 kV100 MW3.0 yrs68.4
UNKNOWN122668Substation-Adjacent138 kV100 MW3.0 yrs68.2
SPY RUNSubstation-Adjacent138 kV100 MW3.0 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP160648, ALLEN. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.