UNKNOWN155611

Substation-Adjacent

CLARK, Indiana · PJM

DC Readiness
67.8
Good / 100

UNKNOWN155611 is a substation-adjacent datacenter candidate site in CLARK, Indiana, interconnecting through PJM. It screens at 67.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN155611
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPFlexential - Louisville/Downtown (LOU02/03/04)
IXP distance6.8 mi
Fiber providers5
Fiber coverage44.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance182.9 mi

Site characteristics

Parcel ownerDUKE ENERGY INDIANA, LLC
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteFREUDENBERG MEDICAL MINIMALLY INVASIVE SOLUTIONS
Hazard sub-score58/100
Construction cost index80.6 (avg 100)

Location context

Nearest datacenterFlexential Louisville - Downtown
DC distance6.8 mi
Nearest rail0.1 mi
Nearest gas pipeline10.5 mi
Nearest fiber route82.1 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.50¢/kWh
Industrial electricity9.88¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,194

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
35
Fiber connectivity12%
82
Energy cost10%
83
Water risk8%
94
Natural hazard8%
58
Buildability7%
90
Labor market4%
50
DC cluster4%
85
Land / acreage3%
60
Construction cost3%
83
Gas pipeline2%
66
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in CLARK, ranked by DC Readiness.

Sites near UNKNOWN155611
SiteTypeVoltageCapacityQueue waitScore
NORTHSIDESubstation-Adjacent345 kV600 MW3.0 yrs71.9
SPEEDSubstation-Adjacent345 kV600 MW3.0 yrs71.7
Greenfield (SPEED - TRIMBLE COUNTY STATION)Greenfield345 kV600 MW3.0 yrs66.8
UNKNOWN125382Substation-Adjacent138 kV100 MW3.0 yrs66.7
UNKNOWN157701Substation-Adjacent138 kV100 MW3.0 yrs65.8
TAP156012Substation-Adjacent138 kV100 MW3.0 yrs63.4
Greenfield (SPEED - TRIMBLE COUNTY STATION)Greenfield345 kV600 MW3.0 yrs63.1
UNKNOWN125328Substation-Adjacent138 kV100 MW3.0 yrs62.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN155611, CLARK. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.