Kokomo Wind Farm (Continental Steel )

Brownfield

HOWARD, Indiana · PJM

DC Readiness
61.3
Good / 100

Kokomo Wind Farm (Continental Steel ) is a brownfield datacenter candidate site in HOWARD, Indiana, interconnecting through PJM. It screens at 61.3/100 DC Readiness with a catalogued 0 MW of candidate capacity.

Power & interconnection

Substation distance3.5 mi
Available capacity0 MW
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56

Connectivity

Nearest IXPORI.NET Noblesville
IXP distance29.6 mi
Fiber providers9
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance125.1 mi

Site characteristics

Site typeBrownfield
Acreage183 ac
Land owner typeprivate
Buildability75.0/100
Former usesuperfund
Existing capacity0 MW
Cleanup statuscleanup_complete

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteKOKOMO SPRING CO INC
Hazard sub-score58/100
Construction cost index83.6 (avg 100)

Location context

Nearest datacenterORI.NET Noblesville
DC distance29.6 mi
Nearest rail0.2 mi
Nearest gas pipeline6.4 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.22¢/kWh
Industrial electricity7.96¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,875

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
34
Fiber connectivity12%
75
Energy cost10%
100
Water risk8%
90
Natural hazard8%
58
Buildability7%
75
Labor market4%
50
DC cluster4%
65
Land / acreage3%
85
Construction cost3%
80
Gas pipeline2%
79
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in HOWARD, ranked by DC Readiness.

Sites near Kokomo Wind Farm (Continental Steel )
SiteTypeVoltageCapacityQueue waitScore
GREENTOWNSubstation-Adjacent765 kV1,000 MW3.0 yrs67.8
UNKNOWN123983Substation-Adjacent230 kV300 MW3.0 yrs65.3
KOKOMO WEBSTER STREETSubstation-Adjacent230 kV300 MW3.0 yrs64.4
NEW LONDONSubstation-Adjacent230 kV300 MW3.0 yrs64.0
UNKNOWN123982Substation-Adjacent138 kV100 MW3.0 yrs62.6
TAP138982Substation-Adjacent138 kV100 MW3.0 yrs62.1
TAP138980Substation-Adjacent138 kV100 MW3.0 yrs61.7
Greenfield (THORNTOWN - KOKOMO HIGHLAND PA)Greenfield230 kV300 MW3.0 yrs60.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Kokomo Wind Farm (Continental Steel ), HOWARD. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.