UNKNOWN169431

Substation-Adjacent

JENNINGS, Indiana · PJM

DC Readiness
68.5
Good / 100

UNKNOWN169431 is a substation-adjacent datacenter candidate site in JENNINGS, Indiana, interconnecting through PJM. It screens at 68.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN169431
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPDartPoints Columbus, IN - CLU1
IXP distance17.8 mi
Fiber providers8
Fiber coverage76.2%
Nearest cloud providerAWS
Nearest cloud regionus-east-2
Cloud region distance153.9 mi

Site characteristics

Parcel ownerDUKE ENERGY INDIANA, LLC
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteNORTH VERNON INDUSTRY CORP
Hazard sub-score58/100
Construction cost index82.6 (avg 100)

Location context

Nearest datacenterDatacenter 567894059
DC distance17.5 mi
Nearest rail1.6 mi
Nearest gas pipeline0.5 mi
Nearest fiber route65.8 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.08¢/kWh
Industrial electricity8.90¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$6,620

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power15%
35
Fiber connectivity12%
81
Energy cost10%
89
Water risk8%
92
Natural hazard8%
58
Buildability7%
100
Labor market4%
50
DC cluster4%
65
Land / acreage3%
44
Construction cost3%
81
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in JENNINGS, ranked by DC Readiness.

Sites near UNKNOWN169431
SiteTypeVoltageCapacityQueue waitScore
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs67.4
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs64.0
Greenfield (LAWRENCE COUNTY STATION - TAP1)Greenfield161 kV100 MW3.0 yrs61.3
OZ JenningsGreenfield3.0 yrs59.3
Greenfield (UNKNOWN124898 - NORTH VERNON)Greenfield138 kV100 MW3.0 yrs57.1
Greenfield (LAWRENCE COUNTY STATION - TAP1)Greenfield161 kV100 MW3.0 yrs56.2
Greenfield (UNKNOWN125319 - NORTH VERNON)Greenfield138 kV100 MW3.0 yrs55.1
DECATUR MOLD, TOOL & ENGINEERING, INC. (INDUSTRIAL MOLD MANUFACTURING)Manufacturing53.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN169431, JENNINGS. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.