Datacenter Sites in KOSCIUSKO, Indiana
KOSCIUSKO has 129 scored datacenter candidate sites averaging 52.5/100 DC Readiness, with a catalogued aggregate of 8,600 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.
129
Candidate sites
52.5/100
Avg DC Readiness
8,600 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
Site-selection context for KOSCIUSKO
Yessales_tax_exemption
Datacenter tax incentive
15.57¢/kWh
Commercial electricity
8.57¢/kWh
Industrial electricity
14
Fiber providers
Low
Water stress
$8,605
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
By site type
Top datacenter sites in KOSCIUSKO
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| MERIDIAN | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 71.0 |
| LEESBURG | Substation-Adjacent | 345 kV | 600 MW | 3.0 yrs | 70.6 |
| Greenfield (MERIDIAN - TWIN BRANCH (345 KV) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 67.7 |
| Greenfield (HIPLE - LEESBURG) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 66.3 |
| Greenfield (SORENSON - DUMONT) | Greenfield | 765 kV | 1,000 MW | 3.0 yrs | 66.3 |
| TAP138970 | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 65.4 |
| Greenfield (MERIDIAN - TWIN BRANCH (345 KV) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 65.3 |
| RABER | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 65.1 |
| Greenfield (LEESBURG - BURR OAK) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 65.1 |
| Greenfield (MERIDIAN - TWIN BRANCH (345 KV) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 64.8 |
| Greenfield (SORENSON - DUMONT) | Greenfield | 765 kV | 1,000 MW | 3.0 yrs | 64.7 |
| UNKNOWN122870 | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 64.4 |
| Greenfield (DEEDSVILLE 345KV - LEESBURG) | Greenfield | 345 kV | 600 MW | 3.0 yrs | 64.4 |
| Greenfield (SORENSON - DUMONT) | Greenfield | 765 kV | 1,000 MW | 3.0 yrs | 62.1 |
| UNKNOWN122871 | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 60.2 |
| Greenfield (UNKNOWN122873 - LEESBURG) | Greenfield | 138 kV | 100 MW | 3.0 yrs | 59.8 |
| Greenfield (UNKNOWN122873 - RABER) | Greenfield | 138 kV | 100 MW | 3.0 yrs | 59.6 |
| Greenfield (UNKNOWN122871 - LEESBURG) | Greenfield | 138 kV | 100 MW | 3.0 yrs | 59.5 |
| UNKNOWN122873 | Substation-Adjacent | 138 kV | 100 MW | 3.0 yrs | 53.9 |
| LAND O' LAKES PURINA FEED, LLC (OTHER ANIMAL FOOD MANUFACTURING) | Manufacturing | — | — | — | 52.5 |
| BROCK GRAIN SYSTEMS (NOT AVAILABLE) | Manufacturing | — | — | — | 52.4 |
| DEKKO TECHNOLOGIES, INC. (HEATING EQUIPMENT (EXCEPT WARM AIR FURNACES) MANUFACTURING) | Manufacturing | — | — | — | 52.3 |
| CTB, INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING) | Manufacturing | — | — | — | 52.3 |
| SELLERS MFG., INC. (SECONDARY SMELTING AND ALLOYING OF ALUMINUM) | Manufacturing | — | — | — | 52.3 |
| GROUP DEKKO, INC. (ALL OTHER PLASTICS PRODUCT MANUFACTURING) | Manufacturing | — | — | — | 52.3 |
KOSCIUSKO datacenter FAQ
- How many datacenter sites are in KOSCIUSKO?
- 129 scored datacenter candidate sites, averaging 52.5/100 DC Readiness.
- Does KOSCIUSKO offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
- What is the natural-hazard risk in KOSCIUSKO?
- FEMA's National Risk Index rates KOSCIUSKO as "Relatively Moderate" (score 32).
- What are industrial electricity rates in KOSCIUSKO?
- Average industrial electricity is 8.57¢/kWh and commercial is 15.57¢/kWh in KOSCIUSKO.