Greenfield (WILTON - DUMONT)

Greenfield

LA PORTE, Indiana · PJM

DC Readiness
67.8
Good / 100

Greenfield (WILTON - DUMONT) is a greenfield datacenter candidate site in LA PORTE, Indiana, interconnecting through PJM. It screens at 67.8/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 4.6 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWILTON
Substation voltage765 kV
Available capacity1,000 MW
LMP zonePJM_COMED
Wholesale LMP$33.95/MWh
Utility commercial rate0.16¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth265
Avg queue wait4.6 yrs
Recent queue wait2.9 yrs
Completion rate21%
Withdrawal rate79%

Connectivity

Nearest IXPAunalytics South Bend Datacenter (AUSB)
IXP distance27.5 mi
Fiber providers9
Fiber coverage46.0%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance56.5 mi

Site characteristics

Site typeGreenfield
Parcel ownerNORTHERN INDIANA PUB SERV CO
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score53/100
Construction cost index93.8 (avg 100)

Location context

Nearest datacenterAmazon AWS Data Center
DC distance19.5 mi
Nearest rail3.2 mi
Nearest gas pipeline1.7 mi
Nearest fiber route69.9 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity15.54¢/kWh
Industrial electricity8.12¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$5,056

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
44
Fiber connectivity12%
64
Energy cost10%
93
Water risk8%
91
Natural hazard8%
53
Buildability7%
65
Labor market4%
50
DC cluster4%
70
Land / acreage3%
47
Construction cost3%
72
Gas pipeline2%
95
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in LA PORTE, ranked by DC Readiness.

Sites near Greenfield (WILTON - DUMONT)
SiteTypeVoltageCapacityQueue waitScore
OLIVESubstation-Adjacent345 kV600 MW2.2 yrs73.5
UNKNOWN122735Substation-Adjacent138 kV100 MW2.2 yrs70.4
Greenfield (WILTON - DUMONT)Greenfield765 kV1,000 MW4.6 yrs68.4
Greenfield (UNKNOWN122727 - BABCOCK)Greenfield345 kV600 MW4.6 yrs68.2
Greenfield (UNKNOWN122738 - OLIVE)Greenfield345 kV600 MW2.2 yrs68.0
Greenfield (UNKNOWN122727 - BABCOCK)Greenfield345 kV600 MW4.6 yrs66.1
UNKNOWN122735Substation-Adjacent138 kV100 MW3.0 yrs65.3
UNKNOWN122736Substation-Adjacent138 kV100 MW3.0 yrs65.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (WILTON - DUMONT), LA PORTE. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.