Datacenter Sites in RIPLEY, Indiana

RIPLEY has 36 scored datacenter candidate sites averaging 52.4/100 DC Readiness, with a catalogued aggregate of 3,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

36
Candidate sites
52.4/100
Avg DC Readiness
3,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for RIPLEY

Yessales_tax_exemption
Datacenter tax incentive
12.16¢/kWh
Commercial electricity
8.39¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$6,590
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in RIPLEY

Top datacenter sites in RIPLEY
SiteTypeVoltageCapacityQueue waitScore
BATESVILLESubstation-Adjacent345 kV600 MW3.0 yrs64.6
Greenfield (GHENT STATION - BATESVILLE)Greenfield345 kV600 MW3.0 yrs64.4
UNKNOWN124895Substation-Adjacent138 kV100 MW3.0 yrs64.2
TAP137552Substation-Adjacent138 kV100 MW3.0 yrs64.0
Greenfield (GHENT STATION - BATESVILLE)Greenfield345 kV600 MW3.0 yrs63.7
HUBBELLSubstation-Adjacent138 kV100 MW3.0 yrs63.3
Greenfield (GHENT STATION - BATESVILLE)Greenfield345 kV600 MW3.0 yrs63.2
UNKNOWN125511Substation-Adjacent138 kV100 MW3.0 yrs60.3
Greenfield (UNKNOWN124902 - UNKNOWN125089)Greenfield161 kV100 MW3.0 yrs58.8
Greenfield (UNKNOWN125090 - TAP137552)Greenfield138 kV100 MW3.0 yrs58.3
Greenfield (UNKNOWN124902 - UNKNOWN125511)Greenfield138 kV100 MW3.0 yrs55.1
Greenfield (UNKNOWN124895 - UNKNOWN125230)Greenfield138 kV100 MW3.0 yrs54.5
MASTERPIECE STUDIOS (COMMERCIAL LITHOGRAPHIC PRINTING)Manufacturing50.6
J & J PACKAGING (FOLDING PAPERBOARD BOX MANUFACTURING)Manufacturing50.5
NAPOLEON HARDWOOD, INC. (SAWMILLS)Manufacturing50.4
HILL-ROM CO., INC. (NOT AVAILABLE)Manufacturing49.5
VERSAILLES DUNBRIK CO., INC. (OTHER CONCRETE PRODUCT MANUFACTURING)Manufacturing49.5
HANSON AGGREGATES (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing49.5
VIRTUS, INC. (MATTRESS MANUFACTURING)Manufacturing49.5
ROMWEBER CO., THE (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing49.5
HEARTWOOD MFG. INC. (NONUPHOLSTERED WOOD HOUSEHOLD FURNITURE MANUFACTURING)Manufacturing49.5
HILL-ROM CO., INC. (SURGICAL AND MEDICAL INSTRUMENT MANUFACTURING)Manufacturing49.5
OHIO ROD PRODUCTS (FASTENER, BUTTON, NEEDLE, AND PIN MANUFACTURING)Manufacturing49.5
MIRRUS CORP., INC. (ALL OTHER MOTOR VEHICLE PARTS MANUFACTURING)Manufacturing49.5
NANCO UNIFORM MFR. (MEN'S AND BOYS' CUT AND SEW WORK CLOTHING MANUFACTURING)Manufacturing49.5

RIPLEY datacenter FAQ

How many datacenter sites are in RIPLEY?
36 scored datacenter candidate sites, averaging 52.4/100 DC Readiness.
Does RIPLEY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in RIPLEY?
FEMA's National Risk Index rates RIPLEY as "Relatively Moderate" (score 32).
What are industrial electricity rates in RIPLEY?
Average industrial electricity is 8.39¢/kWh and commercial is 12.16¢/kWh in RIPLEY.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RIPLEY, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.