Datacenter Sites in SHELBY, Indiana

SHELBY has 73 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 7,200 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

73
Candidate sites
54.8/100
Avg DC Readiness
7,200 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for SHELBY

Yessales_tax_exemption
Datacenter tax incentive
12.24¢/kWh
Commercial electricity
8.70¢/kWh
Industrial electricity
11
Fiber providers
Low
Water stress
$10,164
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in SHELBY

Top datacenter sites in SHELBY
SiteTypeVoltageCapacityQueue waitScore
GWYNNEVILLESubstation-Adjacent345 kV600 MW3.0 yrs71.8
HANNASubstation-Adjacent345 kV600 MW3.0 yrs68.0
TAP138337Substation-Adjacent138 kV100 MW3.0 yrs66.7
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs66.6
UNKNOWN125087Substation-Adjacent138 kV100 MW3.0 yrs66.4
Greenfield (JEFFERSON - GREENTOWN)Greenfield765 kV1,000 MW3.0 yrs66.2
UNKNOWN125092Substation-Adjacent138 kV100 MW3.0 yrs65.3
Greenfield (UNKNOWN125086 - COLUMBUS (345K)Greenfield345 kV600 MW3.0 yrs64.8
Greenfield (UNKNOWN125086 - GWYNNEVILLE)Greenfield345 kV600 MW3.0 yrs64.5
Greenfield (UNKNOWN124885 - HANNA)Greenfield345 kV600 MW3.0 yrs64.3
TAP138338Substation-Adjacent138 kV100 MW3.0 yrs64.3
Greenfield (UNKNOWN125086 - COLUMBUS (345K)Greenfield345 kV600 MW3.0 yrs64.2
UNKNOWN125091Substation-Adjacent138 kV100 MW3.0 yrs63.3
Greenfield (UNKNOWN125098 - UNKNOWN125100)Greenfield230 kV300 MW3.0 yrs63.0
UNKNOWN125094Substation-Adjacent138 kV100 MW3.0 yrs62.3
Greenfield (UNKNOWN125098 - UNKNOWN125100)Greenfield230 kV300 MW3.0 yrs62.2
Greenfield (FRANKLIN - COLUMBUS (345KV))Greenfield230 kV300 MW3.0 yrs59.6
Greenfield (UNKNOWN125087 - UNKNOWN125089)Greenfield138 kV100 MW3.0 yrs58.3
BROOKFIELD SAND & GRAVEL, INC. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing55.8
M P L CORP. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing54.6
JUPITER COIL COATERS (METAL COATING, ENGRAVING (EXCEPT JEWELRY AND SILVERWARE), AND ALLIED SERVICES TO MANUFACTURERS)Manufacturing54.5
KLOSTERMAN BAKERY, INC. (COMMERCIAL BAKERIES)Manufacturing54.2
KASCO MFG CO., INC. (FARM MACHINERY AND EQUIPMENT MANUFACTURING)Manufacturing54.2
FREUDENBERG-NOK SPECIAL SEALING PRODUCTS (ALL OTHER RUBBER PRODUCT MANUFACTURING)Manufacturing53.9
PARK 100 FOODS, INC. (SPECIALTY CANNING)Manufacturing53.7

SHELBY datacenter FAQ

How many datacenter sites are in SHELBY?
73 scored datacenter candidate sites, averaging 54.8/100 DC Readiness.
Does SHELBY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in SHELBY?
FEMA's National Risk Index rates SHELBY as "Relatively Moderate" (score 32).
What are industrial electricity rates in SHELBY?
Average industrial electricity is 8.70¢/kWh and commercial is 12.24¢/kWh in SHELBY.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SHELBY, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.