WABASH, Indiana · PJM

DC Readiness
60.9
Good / 100

TAP174183 is a substation-adjacent datacenter candidate site in WABASH, Indiana, interconnecting through PJM. It screens at 60.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP174183
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
LMP zonePJM_DUKE
Wholesale LMP$41.74/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionPJM
Queue depth56
Avg queue wait3.0 yrs
Recent queue wait4.2 yrs
Completion rate14%
Withdrawal rate87%

Connectivity

Nearest IXPINdigital
IXP distance39.6 mi
Fiber providers9
Fiber coverage85.2%
Nearest cloud providerAzure
Nearest cloud regionnorthcentralus
Cloud region distance120.5 mi

Site characteristics

Parcel ownerDUKE ENERGY INDIANA, LLC
Land owner typeprivate
Buildability100.0/100
Land cover (NLCD)Developed, High Intensity
Former useoil
Existing capacity105 MW
Retirement date2018-06-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteDUKE ENERGY MIAMI WABASH STATION
Hazard sub-score58/100
Construction cost index77.5 (avg 100)

Location context

Nearest datacenterINdigital
DC distance39.6 mi
Nearest rail0.3 mi
Nearest gas pipeline28.4 mi
Nearest fiber route60.4 mi
County hazard (FEMA NRI)Relatively Moderate (32)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.42¢/kWh
Industrial electricity8.11¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,802

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
45
Fiber connectivity12%
30
Energy cost10%
83
Water risk8%
90
Natural hazard8%
58
Buildability7%
100
Labor market4%
50
DC cluster4%
45
Land / acreage3%
56
Construction cost3%
85
Gas pipeline2%
8
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in WABASH, ranked by DC Readiness.

Sites near TAP174183
SiteTypeVoltageCapacityQueue waitScore
EC Near Miami WabashGreenfield3.0 yrs58.5
WABASHSubstation-Adjacent138 kV100 MW3.0 yrs58.2
EC Near Miami WabashGreenfield3.0 yrs56.3
EC Near Miami WabashGreenfield3.0 yrs55.4
EC Near Miami WabashGreenfield3.0 yrs55.3
EC Near Miami WabashGreenfield3.0 yrs55.3
EC Near Miami WabashGreenfield3.0 yrs55.2
EC Near Miami WabashGreenfield3.0 yrs55.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.