Datacenter Sites in WHITLEY, Indiana

WHITLEY has 67 scored datacenter candidate sites averaging 55.0/100 DC Readiness, with a catalogued aggregate of 6,300 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

67
Candidate sites
55.0/100
Avg DC Readiness
6,300 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating

Site-selection context for WHITLEY

Yessales_tax_exemption
Datacenter tax incentive
12.79¢/kWh
Commercial electricity
7.66¢/kWh
Industrial electricity
8
Fiber providers
Low
Water stress
$8,939
Land price / acre
1,000
Cooling degree days
5,500
Heating degree days
52°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.

By site type

Top datacenter sites in WHITLEY

Top datacenter sites in WHITLEY
SiteTypeVoltageCapacityQueue waitScore
E. WHITLEYSubstation-Adjacent345 kV600 MW3.0 yrs68.4
Greenfield (ROBISON PARK (345 KV) - SORENS)Greenfield345 kV600 MW3.0 yrs67.7
Greenfield (OLIVE - SORENSON)Greenfield345 kV600 MW2.2 yrs66.7
SATURNSubstation-Adjacent138 kV100 MW3.0 yrs66.3
Greenfield (SORENSON - DUMONT)Greenfield765 kV1,000 MW3.0 yrs65.2
Greenfield (SORENSON - DUMONT)Greenfield765 kV1,000 MW3.0 yrs64.7
TAP160239Substation-Adjacent138 kV100 MW3.0 yrs64.7
UNKNOWN123034Substation-Adjacent138 kV100 MW3.0 yrs64.5
Greenfield (MERIDIAN - TWIN BRANCH (345 KV)Greenfield345 kV600 MW3.0 yrs63.7
Greenfield (MERIDIAN - TWIN BRANCH (345 KV)Greenfield345 kV600 MW3.0 yrs63.2
Greenfield (UNKNOWN122873 - RABER)Greenfield138 kV100 MW3.0 yrs60.6
Greenfield (SATURN - SORENSON)Greenfield138 kV100 MW3.0 yrs59.1
Greenfield (MCKINLEY - UNKNOWN175894)Greenfield138 kV100 MW3.0 yrs58.0
Greenfield (UNKNOWN122873 - RABER)Greenfield138 kV100 MW3.0 yrs57.8
Greenfield (ILLINOIS ROAD - SORENSON)Greenfield345 kV600 MW3.0 yrs57.2
STEEL DYNAMICS, INC. (FABRICATED STRUCTURAL METAL MANUFACTURING)Manufacturing56.0
ESSEX GROUP, INC., METAL PROCESSING DIV. (PRIMARY SMELTING AND REFINING OF NONFERROUS METAL (EXCEPT COPPER AND ALUMINUM))Manufacturing55.8
C & A TOOL ENGINEERING, INC. (MACHINE SHOPS)Manufacturing55.8
BRC RUBBER & PLASTICS, INC. (RUBBER PRODUCT MANUFACTURING FOR MECHANICAL USE)Manufacturing55.8
CHROMASOURCE, INC. (NOT AVAILABLE)Manufacturing55.8
DANA CORP., FLUID ROUTING GROUP (OTHER METAL VALVE AND PIPE FITTING MANUFACTURING)Manufacturing55.8
AUTOLIV NORTH AMERICA, INC. (NOT AVAILABLE)Manufacturing55.6
MICROPULSE INC. (ELECTROMEDICAL AND ELECTROTHERAPEUTIC APPARATUS MANUFACTURING)Manufacturing55.6
PYROTEK, INC. (NOT AVAILABLE)Manufacturing55.5
80/20, INC. (OTHER ALUMINUM ROLLING AND DRAWING)Manufacturing55.4

WHITLEY datacenter FAQ

How many datacenter sites are in WHITLEY?
67 scored datacenter candidate sites, averaging 55.0/100 DC Readiness.
Does WHITLEY offer datacenter tax incentives?
Sales tax exemption on DC equipment for $750M+/$400M+ investments; EDGE credits up to 100% of payroll taxes.
What is the natural-hazard risk in WHITLEY?
FEMA's National Risk Index rates WHITLEY as "Relatively Moderate" (score 32).
What are industrial electricity rates in WHITLEY?
Average industrial electricity is 7.66¢/kWh and commercial is 12.79¢/kWh in WHITLEY.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WHITLEY, Indiana. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.