Greenfield (EAST CALAMUS - SUTLIFF)
GreenfieldCedar, Iowa · MISO
Greenfield (EAST CALAMUS - SUTLIFF) is a greenfield datacenter candidate site in Cedar, Iowa, interconnecting through MISO. It screens at 63.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Cedar, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EAST CALAMUS | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 67.3 |
| SUTLIFF | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.8 |
| EC Near Durant | Greenfield | — | — | 1.4 yrs | 63.8 |
| EC Near Durant | Greenfield | — | — | 1.4 yrs | 63.4 |
| EC Near Tipton | Greenfield | — | — | 1.4 yrs | 63.3 |
| EC Near Tipton | Greenfield | — | — | 1.4 yrs | 63.1 |
| EC Coal Cedar County | Greenfield | — | — | 1.4 yrs | 62.9 |
| EC Near Tipton | Greenfield | — | — | 1.4 yrs | 62.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.