Greenfield (UNKNOWN130512 - LIME CREEK)

Greenfield

Worth County, Iowa · MISO

DC Readiness
64.6
Good / 100

Greenfield (UNKNOWN130512 - LIME CREEK) is a greenfield datacenter candidate site in Worth County, Iowa, interconnecting through MISO. It screens at 64.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN130512
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth21
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPRouter12 - Brick and Tile
IXP distance11.4 mi
Fiber providers5
Fiber coverage100.0%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance99.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerMIDAMERICAN ENERGY CO
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score70/100
Construction cost index69.9 (avg 100)

Location context

Nearest datacenterRouter12 - Brick and Tile
DC distance11.4 mi
Nearest rail1.7 mi
Nearest gas pipeline0.4 mi
Nearest fiber route16.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.05¢/kWh
Industrial electricity7.72¢/kWh
Cooling degree days900
Heating degree days6,500
Land price / acre$9,241

Incentive detail: Sales tax exemption on DC equipment for $1M+ investments; property tax phase-in for new construction.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
55
Fiber connectivity12%
79
Energy cost10%
85
Water risk8%
88
Natural hazard8%
70
Buildability7%
65
Labor market4%
50
DC cluster4%
85
Land / acreage3%
40
Construction cost3%
92
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Worth County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN130512 - LIME CREEK)
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN138092Substation-Adjacent161 kV100 MW1.4 yrs74.3
UNKNOWN133291Substation-Adjacent161 kV100 MW1.4 yrs72.7
UNKNOWN129404Substation-Adjacent161 kV100 MW1.4 yrs71.9
TAP163601Substation-Adjacent161 kV100 MW1.4 yrs71.2
UNKNOWN130512Substation-Adjacent161 kV100 MW1.4 yrs71.1
Greenfield (LIME CREEK - TAP173444)Greenfield161 kV100 MW1.4 yrs66.0
Greenfield (UNKNOWN133291 - COLBY)Greenfield161 kV100 MW1.4 yrs65.7
Greenfield (UNKNOWN138092 - TAP163601)Greenfield161 kV100 MW1.4 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN130512 - LIME CREEK), Worth County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.