Gray County, Kansas · SPP

DC Readiness
61.5
Good / 100

TAP175744 is a substation-adjacent datacenter candidate site in Gray County, Kansas, interconnecting through SPP. It screens at 61.5/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP175744
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneSPP_NORTH
Wholesale LMP$21.13/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionSPP
Queue depth16
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Fiber providers1
Fiber coverage99.6%
Nearest cloud providerGCP
Nearest cloud regionus-central1
Cloud region distance338.5 mi

Site characteristics

Parcel ownerPIONEER ELECTRIC COOP, INC - (KS)
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)2.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCARL LEATHERWOOD INC
Hazard sub-score55/100
Construction cost index94.6 (avg 100)

Location context

Nearest datacenterCloud Storage Corp
DC distance93.7 mi
Nearest rail0.7 mi
Nearest gas pipeline14.2 mi
Nearest fiber route17.2 mi
County hazard (FEMA NRI)Relatively High (35)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity10.04¢/kWh
Industrial electricity7.38¢/kWh
Cooling degree days1,400
Heating degree days5,000
Land price / acre$1,985

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
51
Fiber connectivity12%
77
Energy cost10%
88
Water risk8%
52
Natural hazard8%
55
Buildability7%
75
Labor market4%
50
DC cluster4%
20
Land / acreage3%
52
Construction cost3%
71
Gas pipeline2%
54
Tax incentive2%
100
Climate / cooling2%
55

Nearby comparable sites

Other scored datacenter candidate sites in Gray County, ranked by DC Readiness.

Sites near TAP175744
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN157103Substation-Adjacent345 kV600 MW3.5 yrs70.7
CIMARRONSubstation-Adjacent345 kV600 MW3.5 yrs69.2
UNKNOWN119623Substation-Adjacent115 kV100 MW3.5 yrs64.4
UNKNOWN119640Substation-Adjacent115 kV100 MW3.5 yrs64.3
UNKNOWN119622Substation-Adjacent115 kV100 MW3.5 yrs63.8
Greenfield (HOLCOMB - CIMARRON)Greenfield345 kV600 MW3.5 yrs63.5
Greenfield (HOLCOMB - CIMARRON)Greenfield345 kV600 MW3.5 yrs62.2
Greenfield (SPEARVILLE - CIMARRON)Greenfield345 kV600 MW3.5 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP175744, Gray County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.