Datacenter Sites in Phillips, Kansas

Phillips has 21 scored datacenter candidate sites averaging 54.5/100 DC Readiness, with a catalogued aggregate of 402 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

21
Candidate sites
54.5/100
Avg DC Readiness
402 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating

Site-selection context for Phillips

Yesproperty_tax_exemption
Datacenter tax incentive
13.43¢/kWh
Commercial electricity
7.63¢/kWh
Industrial electricity
2
Fiber providers
Medium-High
Water stress
$1,912
Land price / acre
1,400
Cooling degree days
5,000
Heating degree days
55°F
Mean annual temp

Incentive detail: PEAK program payroll tax incentives; IRB property tax exemptions available.

By site type

Top datacenter sites in Phillips

Top datacenter sites in Phillips
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN118125Substation-Adjacent115 kV100 MW3.5 yrs61.9
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs59.4
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs59.4
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs59.0
Greenfield (UNKNOWN118124 - UNKNOWN118125)Greenfield115 kV100 MW3.5 yrs58.8
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs58.6
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs58.3
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs58.0
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs57.2
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs56.8
Greenfield (UNKNOWN118125 - UNKNOWN118126)Greenfield115 kV100 MW3.5 yrs56.4
Prairie Horizon Agri EnergyBrownfield2 MW3.5 yrs56.2
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs56.2
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs56.2
Greenfield (UNKNOWN118125 - UNKNOWN119955)Greenfield115 kV100 MW3.5 yrs55.7
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs52.0
EC Near Prairie Horizon Agri EnergyGreenfield3.5 yrs51.1
Phillipsburg Armory BTAIndustrial44.4
Phillipsburg - Sign SolutionsIndustrial44.4
Phillipsburg Retail BTAIndustrial44.3
Phillipsburg Auto ServiceIndustrial39.5

Phillips datacenter FAQ

How many datacenter sites are in Phillips?
21 scored datacenter candidate sites, averaging 54.5/100 DC Readiness.
Does Phillips offer datacenter tax incentives?
PEAK program payroll tax incentives; IRB property tax exemptions available.
What is the natural-hazard risk in Phillips?
FEMA's National Risk Index rates Phillips as "Relatively High" (score 35).
What are industrial electricity rates in Phillips?
Average industrial electricity is 7.63¢/kWh and commercial is 13.43¢/kWh in Phillips.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Phillips, Kansas. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.