Hwy 227 Development -- Carrollton Site 041-016

Shovel-Ready

Carroll County, Kentucky · PJM

DC Readiness
48.0
Fair / 100

Hwy 227 Development -- Carrollton Site 041-016 is a shovel-ready datacenter candidate site in Carroll County, Kentucky, interconnecting through PJM. It screens at 48.0/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth221

Connectivity

Nearest IXPFlexential - Louisville/East (LOU5)
IXP distance33.3 mi

Site characteristics

Site typeShovel-Ready
Acreage13 ac
Former useShovel-ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterFlexential Louisville - East
DC distance33.3 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.07¢/kWh
Industrial electricity6.85¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$4,769

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
50
Fiber connectivity12%
29
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
37
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Carroll County, ranked by DC Readiness.

Sites near Hwy 227 Development -- Carrollton Site 041-016
SiteTypeVoltageCapacityQueue waitScore
CLIFTY CREEKSubstation-Adjacent345 kV600 MW3.0 yrs67.8
UNKNOWN125278Substation-Adjacent345 kV600 MW3.0 yrs67.0
UNKNOWN133794Substation-Adjacent345 kV600 MW3.0 yrs64.6
Greenfield (JEFFERSON - HANGING ROCK)Greenfield765 kV1,000 MW3.0 yrs63.9
Greenfield (CLIFTY CREEK - PIERCE)Greenfield345 kV600 MW3.0 yrs62.5
Greenfield (UNKNOWN129047 - GHENT STATION)Greenfield345 kV600 MW3.0 yrs62.5
Greenfield (JEFFERSON - HANGING ROCK)Greenfield765 kV1,000 MW3.0 yrs62.2
Greenfield (CLIFTY CREEK - PIERCE)Greenfield345 kV600 MW3.0 yrs61.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hwy 227 Development -- Carrollton Site 041-016, Carroll County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.