Scotty's Industrial Park

Shovel-Ready

Warren County, Kentucky · PJM

DC Readiness
56.3
Good / 100

Scotty's Industrial Park is a shovel-ready datacenter candidate site in Warren County, Kentucky, interconnecting through PJM. It screens at 56.3/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth221

Connectivity

Nearest IXPLost River Data Center
IXP distance8.9 mi

Site characteristics

Site typeShovel-Ready
Acreage30 ac
Former useShovel-ready

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterLost River Data Center
DC distance8.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.64¢/kWh
Industrial electricity6.27¢/kWh
Cooling degree days1,300
Heating degree days4,300
Land price / acre$5,899

Incentive detail: Sales tax exemption on electricity for large industrial users; KBI tax credits.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
50
Fiber connectivity12%
84
Energy cost10%
50
Water risk8%
92
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Warren County, ranked by DC Readiness.

Sites near Scotty's Industrial Park
SiteTypeVoltageCapacityQueue waitScore
MEMPHIS JUNCTIONSubstation-Adjacent161 kV100 MW3.6 yrs69.6
UNKNOWN124072Substation-Adjacent161 kV100 MW3.6 yrs69.1
TAP161559Substation-Adjacent161 kV100 MW3.6 yrs67.8
SOUTH BOWLING GREENSubstation-Adjacent161 kV100 MW3.6 yrs67.8
EAST BOWLING GREENSubstation-Adjacent161 kV100 MW3.6 yrs66.5
TAP174999Substation-Adjacent161 kV100 MW3.6 yrs66.0
BRISTOWSubstation-Adjacent161 kV100 MW3.6 yrs65.8
BOWLING GREENSubstation-Adjacent161 kV100 MW3.6 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Scotty's Industrial Park, Warren County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.