Greenfield (MC KNIGHT - FANCY POINT) is a greenfield datacenter candidate site in East Feliciana County, Louisiana, interconnecting through MISO. It screens at 66.9/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMC KNIGHT
Substation voltage500 kV
Available capacity1,000 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPVenyu BTR1
IXP distance20.2 mi
Fiber providers5
Fiber coverage19.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance363.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY GULF STATES - LA LLC
Land owner typeprivate
Buildability75.0/100
Land cover (NLCD)Pasture/Hay

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index79.5 (avg 100)

Location context

Nearest datacenterVenyu BTR1
DC distance20.2 mi
Nearest rail3.0 mi
Nearest gas pipeline4.7 mi
Nearest fiber route119.6 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.05¢/kWh
Industrial electricity10.43¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$4,244

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
54
Fiber connectivity12%
63
Energy cost10%
88
Water risk8%
92
Natural hazard8%
42
Buildability7%
75
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
84
Gas pipeline2%
85
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in East Feliciana County, ranked by DC Readiness.

Sites near Greenfield (MC KNIGHT - FANCY POINT)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (MC KNIGHT - FANCY POINT)Greenfield500 kV1,000 MW1.4 yrs67.3
UNKNOWN114356Substation-Adjacent230 kV300 MW1.4 yrs64.5
TAP143377Substation-Adjacent230 kV300 MW1.4 yrs61.3
UNKNOWN112438Substation-Adjacent230 kV300 MW1.4 yrs61.2
Greenfield (MC KNIGHT - FANCY POINT)Greenfield500 kV1,000 MW1.4 yrs54.8
OZ East FelicianaGreenfield1.4 yrs52.8
Mine SiteFormer Mine43.4
Mine SiteFormer Mine43.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (MC KNIGHT - FANCY POINT), East Feliciana County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.