UNKNOWN116711

Substation-Adjacent

Lincoln, Louisiana · MISO

DC Readiness
61.6
Good / 100

UNKNOWN116711 is a substation-adjacent datacenter candidate site in Lincoln, Louisiana, interconnecting through MISO. It screens at 61.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN116711
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance52.7 mi
Fiber providers5
Fiber coverage18.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance230.2 mi

Site characteristics

Parcel ownerENTERGY LOUISIANA LLC
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index69.0 (avg 100)

Location context

Nearest datacenterDartPoints Shreveport, LA - SHV1
DC distance52.7 mi
Nearest rail1.7 mi
Nearest gas pipeline1.1 mi
Nearest fiber route118.6 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.18¢/kWh
Industrial electricity7.45¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$3,861

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
54
Fiber connectivity12%
54
Energy cost10%
88
Water risk8%
88
Natural hazard8%
42
Buildability7%
70
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
93
Gas pipeline2%
97
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Lincoln, ranked by DC Readiness.

Sites near UNKNOWN116711
SiteTypeVoltageCapacityQueue waitScore
MOUNT OLIVESubstation-Adjacent500 kV1,000 MW1.4 yrs72.8
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs63.2
UNKNOWN116921Substation-Adjacent115 kV100 MW1.4 yrs63.0
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs62.8
Greenfield (MOUNT OLIVE - EL DORADO SUBSTA)Greenfield500 kV1,000 MW1.4 yrs62.3
UNKNOWN116925Substation-Adjacent115 kV100 MW1.4 yrs62.1
UNKNOWN116923Substation-Adjacent115 kV100 MW1.4 yrs62.1
UNKNOWN116922Substation-Adjacent115 kV100 MW1.4 yrs61.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN116711, Lincoln. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.