Greenfield (EL DORADO SUBSTATION - STERLIN)

Greenfield

Union Parish, Louisiana · MISO

DC Readiness
62.6
Good / 100

Greenfield (EL DORADO SUBSTATION - STERLIN) is a greenfield datacenter candidate site in Union Parish, Louisiana, interconnecting through MISO. It screens at 62.6/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationEL DORADO SUBSTATION
Substation voltage500 kV
Available capacity1,000 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance96.0 mi
Fiber providers4
Fiber coverage7.2%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance270.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY ARKANSAS INC
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)0.60
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score42/100
Construction cost index75.3 (avg 100)

Location context

Nearest datacenterDartPoints Shreveport, LA - SHV1
DC distance96.0 mi
Nearest rail7.8 mi
Nearest gas pipeline1.8 mi
Nearest fiber route161.7 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.54¢/kWh
Industrial electricity9.55¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$3,928

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
72
Speed to power15%
48
Fiber connectivity12%
47
Energy cost10%
95
Water risk8%
85
Natural hazard8%
42
Buildability7%
70
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
87
Gas pipeline2%
94
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Union Parish, ranked by DC Readiness.

Sites near Greenfield (EL DORADO SUBSTATION - STERLIN)
SiteTypeVoltageCapacityQueue waitScore
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs62.3
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs61.6
UNKNOWN112555Substation-Adjacent115 kV100 MW1.4 yrs60.6
UNKNOWN116945Substation-Adjacent115 kV100 MW1.4 yrs60.4
Greenfield (EL DORADO SUBSTATION - STERLIN)Greenfield500 kV1,000 MW1.4 yrs59.9
UNKNOWN107844Substation-Adjacent115 kV100 MW1.4 yrs58.1
UNKNOWN116930Substation-Adjacent115 kV100 MW1.4 yrs57.9
Greenfield (UNKNOWN112555 - STERLINGTON)Greenfield115 kV100 MW1.4 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (EL DORADO SUBSTATION - STERLIN), Union Parish. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.