Greenfield (RODEMACHER - EAST LEESVILLE) is a greenfield datacenter candidate site in Vernon Parish, Louisiana, interconnecting through MISO. It screens at 54.0/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationRODEMACHER
Substation voltage230 kV
Available capacity300 MW
LMP zoneMISO_LOUISIANA
Wholesale LMP$32.39/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth176
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPDartPoints Shreveport, LA - SHV1
IXP distance97.5 mi
Fiber providers5
Fiber coverage50.1%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance243.8 mi

Site characteristics

Site typeGreenfield
Parcel ownerENTERGY LOUISIANA LLC
Land owner typeprivate
Buildability15.0/100
Land cover (NLCD)Woody Wetlands

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.60
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score17/100
Construction cost index64.7 (avg 100)

Location context

Nearest datacenterDartPoints Shreveport, LA - SHV1
DC distance97.5 mi
Nearest rail12.8 mi
Nearest gas pipeline0.8 mi
Nearest fiber route88.6 mi
County hazard (FEMA NRI)Very High (58)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.03¢/kWh
Industrial electricity7.94¢/kWh
Cooling degree days2,700
Heating degree days1,700
Land price / acre$5,108

Incentive detail: Industrial Tax Exemption Program (ITEP) up to 80% property tax abatement for 10 years.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
50
Speed to power15%
54
Fiber connectivity12%
55
Energy cost10%
88
Water risk8%
88
Natural hazard8%
17
Buildability7%
15
Labor market4%
50
DC cluster4%
20
Land / acreage3%
47
Construction cost3%
96
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Vernon Parish, ranked by DC Readiness.

Sites near Greenfield (RODEMACHER - EAST LEESVILLE)
SiteTypeVoltageCapacityQueue waitScore
EAST LEESVILLESubstation-Adjacent230 kV300 MW1.4 yrs64.4
LEESVILLESubstation-Adjacent230 kV300 MW1.4 yrs64.0
TOLEDO BENDSubstation-Adjacent138 kV100 MW3.4 yrs61.1
Greenfield (UNKNOWN111922 - UNKNOWN116544)Greenfield138 kV100 MW1.4 yrs59.0
Greenfield (RODEMACHER - EAST LEESVILLE)Greenfield230 kV300 MW1.4 yrs57.0
Greenfield (UNKNOWN111922 - LEESVILLE)Greenfield138 kV100 MW1.4 yrs57.0
EC FFE Vernon ParishGreenfield1.4 yrs54.0
Greenfield (RODEMACHER - EAST LEESVILLE)Greenfield230 kV300 MW1.4 yrs52.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.