EC Near Mead Rumford Cogen
GreenfieldOxford, Maine · ISO-NE
EC Near Mead Rumford Cogen is a greenfield datacenter candidate site in Oxford, Maine, interconnecting through ISO-NE. It screens at 56.1/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Oxford, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| WOODSTOCK | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 64.7 |
| MEAD RUMFORD COGEN | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 64.5 |
| Mead Rumford Cogen | Brownfield | — | 13 MW | — | 63.6 |
| RUMFORD FALLS HYDRO FACILITY | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 60.9 |
| UNKNOWN136744 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 60.3 |
| RUMFORD INDUSTRIAL PARK | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 60.2 |
| UNKNOWN136662 | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 60.0 |
| WOODSTOCK | Substation-Adjacent | 115 kV | 100 MW | 3.5 yrs | 59.9 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for EC Near Mead Rumford Cogen, Oxford. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.