Greenfield (LAKEFIELD JUNCTION - TAP138020)

Greenfield

Jackson, Minnesota · MISO

DC Readiness
63.0
Good / 100

Greenfield (LAKEFIELD JUNCTION - TAP138020) is a greenfield datacenter candidate site in Jackson, Minnesota, interconnecting through MISO. It screens at 63.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationLAKEFIELD JUNCTION
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPSouth Spencer Aureon hut
IXP distance39.8 mi
Fiber providers6
Fiber coverage70.3%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance154.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerNORTHERN STATES POWER CO - MINNESOTA
Land owner typeprivate
Buildability65.0/100
Land cover (NLCD)Cultivated Crops

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score75/100
Construction cost index70.2 (avg 100)

Location context

Nearest datacenterSouth Spencer Aureon hut
DC distance39.8 mi
Nearest rail2.5 mi
Nearest gas pipeline5.3 mi
Nearest fiber route61.2 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.76¢/kWh
Industrial electricity7.21¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$8,449

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
57
Fiber connectivity12%
68
Energy cost10%
86
Water risk8%
92
Natural hazard8%
75
Buildability7%
65
Labor market4%
50
DC cluster4%
45
Land / acreage3%
41
Construction cost3%
92
Gas pipeline2%
83
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Jackson, ranked by DC Readiness.

Sites near Greenfield (LAKEFIELD JUNCTION - TAP138020)
SiteTypeVoltageCapacityQueue waitScore
O'BRIENSubstation-Adjacent345 kV600 MW1.4 yrs74.8
UNKNOWN170860Substation-Adjacent161 kV100 MW1.4 yrs69.8
LAKEFIELD UTILITIESSubstation-Adjacent161 kV100 MW1.4 yrs68.8
UNKNOWN132557Substation-Adjacent161 kV100 MW1.4 yrs68.8
UNKNOWN158246Substation-Adjacent161 kV100 MW1.4 yrs68.6
UNKNOWN129805Substation-Adjacent161 kV100 MW1.4 yrs68.4
TAP170964Substation-Adjacent161 kV100 MW1.4 yrs68.1
Greenfield (UNKNOWN129783 - LAKEFIELD JUNC)Greenfield345 kV600 MW1.4 yrs68.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (LAKEFIELD JUNCTION - TAP138020), Jackson. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.