UNKNOWN129798

Substation-Adjacent

Otter Tail, Minnesota · MISO

DC Readiness
64.6
Good / 100

UNKNOWN129798 is a substation-adjacent datacenter candidate site in Otter Tail, Minnesota, interconnecting through MISO. It screens at 64.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN129798
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.10¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXP702 Communications - Moorhead, MN
IXP distance59.9 mi
Fiber providers13
Fiber coverage57.9%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance348.1 mi

Site characteristics

Parcel ownerOTTER TAIL POWER CO
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund sitePRIME CONSTRUCTION CO
Hazard sub-score65/100
Construction cost index82.6 (avg 100)

Location context

Nearest datacenter702 Communications - Moorhead, MN
DC distance59.9 mi
Nearest rail0.1 mi
Nearest gas pipeline1.2 mi
Nearest fiber route154.2 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.31¢/kWh
Industrial electricity10.03¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$3,840

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
57
Fiber connectivity12%
29
Energy cost10%
87
Water risk8%
93
Natural hazard8%
65
Buildability7%
95
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
81
Gas pipeline2%
96
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Otter Tail, ranked by DC Readiness.

Sites near UNKNOWN129798
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN171144Substation-Adjacent230 kV300 MW1.4 yrs70.0
HOOT LAKESubstation-Adjacent115 kV100 MW1.4 yrs68.3
TAP171146Substation-Adjacent115 kV100 MW1.4 yrs67.9
Greenfield (UNKNOWN133416 - ARROWHEAD)Greenfield250 kV300 MW1.4 yrs67.4
UNKNOWN130796Substation-Adjacent115 kV100 MW1.4 yrs67.1
TAP135306Substation-Adjacent115 kV100 MW1.4 yrs66.7
UNKNOWN129803Substation-Adjacent230 kV300 MW1.4 yrs66.0
Greenfield (UNKNOWN129803 - UNKNOWN171144)Greenfield230 kV300 MW1.4 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN129798, Otter Tail. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.