Greenfield (UNKNOWN129869 - KING PLANT)

Greenfield

Washington County, Minnesota · MISO

DC Readiness
63.2
Good / 100

Greenfield (UNKNOWN129869 - KING PLANT) is a greenfield datacenter candidate site in Washington County, Minnesota, interconnecting through MISO. It screens at 63.2/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN129869
Substation voltage345 kV
Available capacity600 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPH5 Data Centers Minneapolis
IXP distance15.0 mi
Fiber providers8
Fiber coverage29.4%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance212.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerNORTHERN STATES POWER CO - MINNESOTA
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.40
Wetlands (NWI)Present
Critical habitatPresent
Superfund nearbyPresent
Superfund siteHEIGHTS SERVICE INC
Hazard sub-score35/100
Construction cost index107.9 (avg 100)

Location context

Nearest datacenterH5 Minneapolis
DC distance15.0 mi
Nearest rail4.2 mi
Nearest gas pipeline0.6 mi
Nearest fiber route215.1 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.49¢/kWh
Industrial electricity9.39¢/kWh
Cooling degree days600
Heating degree days7,700
Land price / acre$11,320

Incentive detail: Sales tax exemption on DC equipment and electricity for qualified DCs.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
57
Fiber connectivity12%
27
Energy cost10%
86
Water risk8%
91
Natural hazard8%
35
Buildability7%
92
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
60
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near Greenfield (UNKNOWN129869 - KING PLANT)
SiteTypeVoltageCapacityQueue waitScore
MAXWELLSubstation-Adjacent345 kV600 MW1.4 yrs74.8
KING PLANTSubstation-Adjacent345 kV600 MW1.4 yrs70.4
TAP139674Substation-Adjacent115 kV100 MW1.4 yrs70.0
WOODBURYSubstation-Adjacent115 kV100 MW1.4 yrs69.5
Greenfield (UNKNOWN129869 - KING PLANT)Greenfield345 kV600 MW1.4 yrs69.1
LONG LAKESubstation-Adjacent115 kV100 MW1.4 yrs68.2
UNKNOWN129352Substation-Adjacent115 kV100 MW1.4 yrs68.0
UNKNOWN129312Substation-Adjacent115 kV100 MW1.4 yrs67.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (UNKNOWN129869 - KING PLANT), Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.