Datacenter Sites in ALCORN, Mississippi
ALCORN has 55 scored datacenter candidate sites averaging 50.2/100 DC Readiness, with a catalogued aggregate of 1,400 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
55
Candidate sites
50.2/100
Avg DC Readiness
1,400 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for ALCORN
Yessales_tax_exemption
Datacenter tax incentive
11.88¢/kWh
Commercial electricity
5.51¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$2,375
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in ALCORN
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN169436 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 68.4 |
| GLEN | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 67.3 |
| KOSSUTH | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 67.0 |
| TAP154378 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 66.7 |
| TAP154382 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 66.3 |
| TAP154376 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 65.4 |
| KIMBERLY CLARK | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 65.4 |
| UNKNOWN111023 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 65.3 |
| TAP169437 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 64.7 |
| UNKNOWN111022 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 63.7 |
| Greenfield (UNKNOWN111031 - TAP154398) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 60.6 |
| OZ Alcorn | Greenfield | — | — | 1.4 yrs | 60.6 |
| Greenfield (PICKWICK LANDING DAM - TAP1543) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 60.5 |
| TAP154375 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 59.7 |
| Greenfield (TAP154375 - TAP154374) | Greenfield | 161 kV | 100 MW | 1.4 yrs | 52.8 |
| KIMBERLY-CLARK CORP. (TOILET PREPARATION MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
| FCA MFG. CO. (CORRUGATED AND SOLID FIBER BOX MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
| KING MFG. CO., INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
| QUEBECOR WORLD, INC., CORINTH (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | — | 46.3 |
| APAC-MISSISSIPPI, INC. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
| C & D JARNAGIN CO., INC. (ALL OTHER MISCELLANEOUS MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
| HYDRAULIC ANALYSIS, INC. (FLUID POWER PUMP AND MOTOR MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
| CM SOLUTIONS, INC. (NOT AVAILABLE) | Manufacturing | — | — | — | 46.3 |
| REFRESHMENTS, INC. (OTHER SNACK FOOD MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
| CATERPILLAR, INC. (GASOLINE ENGINE AND ENGINE PARTS MANUFACTURING) | Manufacturing | — | — | — | 46.3 |
ALCORN datacenter FAQ
- How many datacenter sites are in ALCORN?
- 55 scored datacenter candidate sites, averaging 50.2/100 DC Readiness.
- Does ALCORN offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in ALCORN?
- FEMA's National Risk Index rates ALCORN as "Relatively High" (score 45).
- What are industrial electricity rates in ALCORN?
- Average industrial electricity is 5.51¢/kWh and commercial is 11.88¢/kWh in ALCORN.
Dataset updated . Screening estimates derived from public data sources.