UNKNOWN110724

Substation-Adjacent

BOLIVAR, Mississippi · MISO

DC Readiness
57.0
Good / 100

UNKNOWN110724 is a substation-adjacent datacenter candidate site in BOLIVAR, Mississippi, interconnecting through MISO. It screens at 57.0/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN110724
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.14¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth161
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPARE-ON Forrest City
IXP distance85.8 mi
Fiber providers7
Fiber coverage43.0%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance354.6 mi

Site characteristics

Parcel ownerENTERGY MISSISSIPPI INC
Land owner typeprivate
Buildability60.0/100

Risk & environment

Flood zoneZone X
Water stress (WRI)0.50
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score55/100
Construction cost index64.6 (avg 100)

Location context

Nearest datacenterARE-ON Forrest City
DC distance85.8 mi
Nearest rail12.2 mi
Nearest gas pipeline0.8 mi
Nearest fiber route171.2 mi
County hazard (FEMA NRI)Relatively High (45)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity14.22¢/kWh
Industrial electricity10.94¢/kWh
Cooling degree days2,400
Heating degree days2,400
Land price / acre$4,310

Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
48
Fiber connectivity12%
18
Energy cost10%
95
Water risk8%
90
Natural hazard8%
55
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
48
Construction cost3%
96
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
5

Nearby comparable sites

Other scored datacenter candidate sites in BOLIVAR, ranked by DC Readiness.

Sites near UNKNOWN110724
SiteTypeVoltageCapacityQueue waitScore
DELTA (MS)Substation-Adjacent115 kV100 MW1.4 yrs62.2
TAP142175Substation-Adjacent115 kV100 MW1.4 yrs61.9
UNKNOWN110723Substation-Adjacent115 kV100 MW1.4 yrs61.7
TAP142176Substation-Adjacent115 kV100 MW1.4 yrs60.9
TAP169439Substation-Adjacent115 kV100 MW1.4 yrs60.8
UNKNOWN110703Substation-Adjacent115 kV100 MW1.4 yrs60.2
CLEVELANDSubstation-Adjacent115 kV100 MW1.4 yrs59.5
Delta (MS)Brownfield225 MW1.4 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN110724, BOLIVAR. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.