Datacenter Sites in George, Mississippi
George has 34 scored datacenter candidate sites averaging 55.5/100 DC Readiness, with a catalogued aggregate of 2,416 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.
34
Candidate sites
55.5/100
Avg DC Readiness
2,416 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
Site-selection context for George
Yessales_tax_exemption
Datacenter tax incentive
11.78¢/kWh
Commercial electricity
8.91¢/kWh
Industrial electricity
6
Fiber providers
Low
Water stress
$4,441
Land price / acre
2,400
Cooling degree days
2,400
Heating degree days
64°F
Mean annual temp
Incentive detail: Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
By site type
Top datacenter sites in George
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| BENNDALE 230 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 69.0 |
| TAP169444 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 66.3 |
| UNKNOWN156620 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 65.3 |
| TAP143376 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 64.7 |
| SOUTHEAST GREENE | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 64.2 |
| BENNDALE 230 | Substation-Adjacent | 161 kV | 100 MW | 1.4 yrs | 63.8 |
| UNKNOWN110256 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 62.1 |
| UNKNOWN110319 | Substation-Adjacent | 230 kV | 300 MW | 1.4 yrs | 61.9 |
| Greenfield (BARRY - UNKNOWN110319) | Greenfield | 230 kV | 300 MW | 1.4 yrs | 61.3 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 60.2 |
| UNKNOWN110311 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 60.1 |
| Greenfield (UNKNOWN110311 - TAP143376) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 58.9 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 57.7 |
| Greenfield (UNKNOWN110319 - TAP169444) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 57.5 |
| TAP141968 | Substation-Adjacent | 115 kV | 100 MW | 1.4 yrs | 56.7 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 56.6 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 55.2 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 55.0 |
| Greenfield (TAP141968 - TAP141969) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 54.4 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 54.3 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 54.1 |
| Benndale | Brownfield | — | 16 MW | 1.4 yrs | 53.7 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 52.8 |
| EC Near Benndale | Greenfield | — | — | 1.4 yrs | 52.4 |
| Greenfield (UNKNOWN110311 - TAP143376) | Greenfield | 115 kV | 100 MW | 1.4 yrs | 52.2 |
George datacenter FAQ
- How many datacenter sites are in George?
- 34 scored datacenter candidate sites, averaging 55.5/100 DC Readiness.
- Does George offer datacenter tax incentives?
- Sales tax exemption on DC equipment for $50M+ investments; fee-in-lieu of property tax.
- What is the natural-hazard risk in George?
- FEMA's National Risk Index rates George as "Relatively High" (score 45).
- What are industrial electricity rates in George?
- Average industrial electricity is 8.91¢/kWh and commercial is 11.78¢/kWh in George.
Dataset updated . Screening estimates derived from public data sources.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for George, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.